My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2026 9:47:37 AM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />EXTERNAL SENDER: Be cautious with links and attachments. <br /> <br />Hi Stacy and Shelley, <br /> <br />@Stacy, your department has approval from the owners for overtime inspection. CJ (CCed) is the owner <br />for Airport Petroleum and we discussed this. <br /> <br />Thank you, <br /> <br />Gurkamal Dhaliwal | Director of Development <br />Elite Business Enterprises, Inc. <br />2190 Meridian Park Blvd, Suite G, Concord, CA 94520 <br />O: +1 (925) 446-6806 | F: +1 (925) 446-6808 | C: +1 (901) 383-3023 <br />E: g.dhaliwal@norcaloffice.com <br /> <br /> <br /> <br />On Mon, Aug 18, 2025 at 4:29 PM Rivera, Stacy [EHD] <srivera@sjgov.org> wrote: <br />Hi Shelley, <br /> <br />Thank you for the call and email. I’ve confirmed that we will need to witness both the beginning and the end <br />of the TruChek test. Our inspector will seal the brine ports with sample/evidence tape after the test begins, <br />and will need to witness that the tape is intact prior to the final measurements being taken. <br /> <br />In the past when this was done at another site, the site chose to run the test for longer than the 10 hours and <br />have those inspections conducted on two back-to-back days. <br /> <br />We could also have an inspector available before or after standard hours to witness either or both ends of <br />the test. If you would like to go with this route, please have the owner of the facility submit approval for <br />overtime in writing to our department (ust@sjgov.org). Please be aware that after hours call back time is <br />billable at a minimum of 3 hours. <br /> <br />Please let me know which option you would prefer, or if you have an alternate solution. <br /> <br />Thank you,
The URL can be used to link to this page
Your browser does not support the video tag.