Laserfiche WebLink
9 <br /> I would like to confirm that brine verification will be taking place prior to any additional brine being <br />added to the tank for testing. <br /> Based on the drawings of the tanks, the brine reservoir is connected to the center compartment. We <br />would like to confirm that the riser being installed for interstice continuity testing will be placed on a <br />separate compartment from the brine reservoir. <br /> Air testing is planned for after removal of the added riser and patching of the hole. Will that test also <br />be conducted tomorrow? Or will they need time to patch it and will you be scheduling that test for <br />another day? <br /> <br />Thank you for your assistance, <br /> <br />Stacy Rivera <br />Lead Sr. Registered Environmental Health Specialist <br /> <br />San Joaquin County Environmental Health Department <br />1868 E. Hazelton Ave., Stockton, CA 95205 <br />phone (209) 616-3043 <br />fax (209) 468-3433 <br /> <br /> <br />*Test notifications and test results should be sent to the general UST email: ust@sjgov.org* <br /> <br />*NOTE* I will be out of office every other Friday. If you are unable to reach me on those days and need to speak to someone <br />immediately, please call (209) 468-3420 or email our UST email address. <br />June 6, 20 | July 18 | August 1, 15, 29 | September 12, 26 <br /> <br />EHD will be closed for the holidays on: <br />July 4 | September 1 | November 11, 27, 28 | December 25 <br /> <br />From: Alex Kandathil <Alex.Kandathil@mattr.com> <br />Sent: Monday, August 18, 2025 9:45 AM <br />To: Rivera, Stacy [EHD] <srivera@sjgov.org>