My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN Environmental Health Department <br /> COUNTY— <br /> PRIOR TO FIRST FUEL DELIVERY: <br /> 8. A valid California Department of Tax and Fee Administration (CDTFA) number must be obtained and <br /> provided to EHID prior to fuel drop. This number must be uploaded into the California Environmental <br /> Reporting System (CERS) at https://cers.calepa.ca.gov. <br /> 9. Submit to CERS a complete UST submittal. The UST submittal must be approved by EHD prior to <br /> receiving approval for fuel delivery. <br /> WITHIN 30 DAYS OF RECEIVING FUEL IN THE UST SYSTEM: <br /> 10. Submit to CERS all applicable hazardous materials (HMBP) elements within 30 days of handling an <br /> undisclosed hazardous material. The HMBP submittal must be approved by EHD. <br /> WITHIN 30 DAYS OF INSTALLING THE UST SYSTEM: <br /> 11. The "UST Certification of Installation/Modification" element in CERS shall be submitted for installed tank <br /> systems, pursuant to CCR 2635(f). <br /> PRIOR TO APPROVAL TO OPERATE: <br /> 12. The following items must be completed prior to receiving approval to operate: <br /> a. An accurate and to-scale as-built diagram or drawing, which indicates the location of the UST <br /> system (underground storage tanks, piping, auxiliary equipment)with respect to buildings or other <br /> landmarks, per CCR 2711(a)(8), must be submitted to EHD. <br /> b. Completed copies of all required installation checklists (tank, etc.) must be submitted to EHD. <br /> c. The designated operator(DO) training requirement must be satisfied, per CCR 2715(c). Submit a <br /> copy of the completed Facility Employee Training Certificate. <br /> d. All outstanding operating permit and service request fees must be paid prior to receiving the final <br /> approval to operate. <br /> This permit expires at the end of the calendar year. If an extension to the expiration date is required, a <br /> written request must be submitted to this office prior to the expiration date of December 31, 2024. <br /> If you have any questions, please call Kristina Saetern at(209) 616-3045 or email ustCcD_s*qov.org. <br /> Thank you, <br /> Stacy ' ra <br /> Lead Senior Registered Environmental Health Specialist <br /> Cc: q.dha1iwa1(d)norca1office.com, s.mann(cDnorcaloffice.com, alex.korek(-o)_diamondzengineerin_q.co <br /> 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.