My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAVO B500 Series <br /> PROBLEM SOLVED Singlewall and Doublewall <br /> RANSITION SUIMI�T' <br /> SIZES U <br /> 0 Small 25.5" 0 <br /> 0 Large 41.5" LISTED <br /> UL 2447 <br /> *See page 2 for dimension drawing and dimension chart <br /> MATERIAL <br /> • Fiberglass <br /> • Epoxy coated galvannealed steel <br /> SPECIFICATIONS <br /> Product Shown 0 Quality FRP construction, no need for gelcoat <br /> B501-S <br /> for chemical resistance <br /> About the B500 Series 10 "Planter" style raised lid to keep surface water <br /> out <br /> Bravo's B500 Series Singlewall and Doublewall <br /> transition sumps are compatible with all common 0 Accommodates up to 5 factory installed AST <br /> motor fuels and can be ordered with standard AST fittings depending on model <br /> fittings pre-installed.The fittings range from <br /> electrical offset (EC)) to 3" compression pass-through 0 Factory mounting points make a rack system <br /> AST fittings.This series comes standard with positive installation simple <br /> concrete anchoring and mounting points for optional <br /> rack system. 10 30-year corrosion warranty <br /> 0 UL2447 listed <br /> Doublewall construction can be monitored with <br /> Bravo Solution Center vacuum or hydrostatically making it triennial <br /> Call or Text (323) 541-3851 testing exempt with continuous monitoring <br /> orders@sbravo.com Ships under a continuous 20" Hg vacuum test <br /> Page I of 2 Innovative Solutions for Secondary Containment DS-3.0106.01 <br /> www.sbravo.com 1800.282.7286 <br />
The URL can be used to link to this page
Your browser does not support the video tag.