"1/4" fuel hose capped"—clarify if this is a fuel hose or a vacuum hose. Also on C6 detail "opening <br /> through primary wall"—no openings through the primary wall are allowed. Contractor will do this. EHD: Still need. <br /> 7. Identify the means to check communication for vacuum monitoring on piping secondary <br /> containment on page T&L2, UDC detail. See details EHD: corrected. <br /> 8.T&L3, detail 5, and T&L4- sump liquid sensor is not shown at the lowest sump point Revised location EHD: <br /> corrected. <br /> 9. Provide cut sheets for tank sumps and penetrations (including electrical) Oand for all UDC <br /> and Vent sump penetrations, leak detectors, overfill. See attached EHD: some cut sheets were provided but some <br /> are still missing, like tank sumps, vent sump, all UDC etc. For example, B1000 cut sheet was included for UDCs, <br /> however, the UDC part number listed on the plans doesn't match the provided UDC cut sheet. Please provide cut <br /> sheets for all the parts listed on the parts list. <br /> 10.The provided parts order list shows 2 tanks with 2 compartments each, plans show two compartment and <br /> three-compartment tanks, clarify and send in the corrected parts order list Revised parts list tanks, 100, 103 see <br /> T&L7 and 7.1 EHD: corrected. <br /> 11. Provide installer/tester certifications for FE Petro and Flex-ing (Fireflex) When we have a contractor EHD: still <br /> need this. <br /> 12. Provide B-20 compatibility information for all components in contact with B-20 See attached sheets. EHD: it's <br /> unclear where this documentation is included, please provide a separate file titled compatibility. <br /> 13.T&L4, the 6K/24K fill sump on 24K tank chaise penetration is not located at sump wall but is <br /> located inside the sump. Also, 6K super tank fill sump has an unlabeled penetration and pipe with <br /> what appears to be an electrical connection that terminates at the bottom of the sump. Revised details EHD: <br /> corrected. <br /> 14.T&L4, details A3 and A4 don't show chaise lines Added line. EHD: corrected. <br /> 15.T&L6, Need vacuum communication details. Added to details EHD: end-of-the-line vacuum communication <br /> provisions couldn't be located on UDC (T&L6), please point them out. <br /> 16. Bravo deflector plates are proposed on T&L6, submit bravo cut sheet and installation <br /> information and indicate on plans how they will be installed. Revised to tank manufacturer. EHD: corrected, per <br /> plans no deflector plates will be installed, if they will be installed- provide the installation details. <br /> 17. No chaise piping is shown to 20K diesel fill sump for vent piping run to vent transition sump. <br /> No chaise piping is shown for this tank on T&L1, update all necessary sheets as well as vacuum zone <br /> details, piping length and volumes. See T&L1 and tanks sections. EHD: corrected. <br /> 18. It's unclear if the master/satellite piping is VPH-monitored double wall piping. Provide a <br /> revision that illustrates, that master/satellite dispenser piping is double wall and VPH monitored. No monitoring <br /> details or vacuum hose connections are shown inside the UDCs x-sections for master/satellite dispensers. Update <br /> vacuum zones to include pipe lengths and volume details. <br /> Revised the details to show this. YES THEY ARE MONITORED EHD: corrected. <br /> 19. Not all parts on the list parts and their diamond reference numbers on each respective plan <br /> sheet match across the plans. For example, part 402 listed multiple times on T&L2 and appears to <br /> point to a Bravo sump penetration, is listed as Fire Flex on the parts list located on page T&L7. To <br /> avoid any plan review delays, ensure that all parts lists are accurate on the future submittals (pages <br /> T&L7 and T&L7.1) and reference accurate parts on all the plan sheets. Done <br /> EHD: some issues are still observed with this item. The following list is not all-inclusive and some other issues may <br /> exist with the parts list reference system, here are some of the examples. Part number 823 (on the parts list) is <br /> listed as 23 each, this part is a combination of 806 and 815 parts for a complete 823 assembly. However 806 part is <br /> also listed separately as 23 each as well as part 815 listed at 23 each- please clarify how many of these will be <br /> installed. Part 400 is listed on several plan sheets, but not included on the parts list. Please provide an explanation <br /> on part 209 "single port spill platform" installed on the vent sump.Three parts 218 (vent sumps containment <br /> boxes) are listed on the parts list, but only one vent sump is proposed on the plans. Part 229 on sheet T&IL3 points <br /> to the overfill prevention drop tube, part 229 on parts lists is identified as a manhole cover. Also, 6 Wayne ovation <br /> 2 <br />