My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
104 Outlook <br /> Fw: SR0083837 - 4607 S. Airport Way, Stockton - Install Repairs <br /> From Rivera, Stacy [EHD] <srivera@sjgov.org> <br /> Date Mon 8/18/2025 10:35 AM <br /> To Alaniz,John [EHD1 <jalanizl@sjgov.org>; Saetern, Kristina Gaen [EHD] <ksaetern@sjgov.org> <br /> 1 4 attachments (11 MB) <br /> 669-655-OO.pdf,Overall Site UST Plan -Airport.pdf,Truchek Test and Data Log 03.25.pdf,Truchek Data Sheet 04.25.pdf; <br /> Get Outlook for 10S <br /> From: Shelley Gibson <Shelley.Gibson@mattr.com> <br /> Sent:Thursday,July 24, 2025 2:19:22 PM <br /> To: EH-UST<ust@sjgov.org> <br /> Cc: David Beard <David.Beard@ mattr.com> <br /> Subject: FW: SR0083837-4607 S. Airport Way, Stockton - Install Repairs <br /> Hey Stacy! <br /> I want to thank you and your team for the call yesterday. We have started an internal review <br /> based on your concerns and frustrations so that this does not occur again. <br /> I have put the extra testing requests below with comments about what we discussed or what I <br /> will provide as a substitution. <br /> 1. Primary tank test of all three tanks in the split tank, in accordance with manufacturer <br /> specifications. — No concern from Xerxes <br /> 2. Secondary containment tank test of the split tank (interstice testing), in accordance with <br /> manufacturer specifications, prior to brine filling. — Please see attached Truchek documents <br /> as proposed substitution testing. <br /> 3. Confirmation of interstice continuity for all three compartments in the split tank. — Prior to <br /> Truchek Testing, Xerxes will install a small diameter riser in an end tank sump (see tank dwg <br /> 669-665 attached for proposed sump). Based on the tank layout, pIs advise if you would like <br /> to test the other shell or compartment. <br /> 4. Secondary piping test: Pressure testing of all piping (product, vapor recovery, vent, and <br /> chase), in accordance with manufacturer specifications. — Done by Petroleum Contractor <br /> 5. Integrity testing of all tank top sumps, in accordance with manufacturer specifications. — Done <br /> by Petroleum Contractor <br /> 6. Verification of brine type and witnessing of brine addition in the split tank and tank top sumps. <br /> — Removed original brine stored and re-used. Topped up with Xerxes factory supplied. Xerxes <br /> can provide a letter or proof of shipping. <br /> Also, I have attached a site plan with the compartments identified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.