Laserfiche WebLink
Thank you for the email. <br /> We plan on performing the secondary test on the piping and the tank primary test for you on <br /> Monday. <br /> MTTR Team, Please coordinate the other testing that the county is requiring. <br /> SEAN MURPHY <br /> CEO/OWNER <br /> TOWN & COUNTRY CONTRACTORS INC. <br /> 3206 LUYUNG DR <br /> RANCHO CORDOVA, CA 95742 <br /> (0) 916-636-9500 <br /> (C) 916-997-4527 <br /> (F) 916-636-9507 <br /> SEAN(@TCCONTRACTORS.COM <br /> From: Rivera, Stacy [EHD] <srivera@sjgov.o g> <br /> Sent: Wednesday,July 16, 2025 5:00:47 PM <br /> To: Gurkarnal Dhaliwal <g.dhaIiwaI@norcaIoffice.com> <br /> Cc: CJ Dhaliwal <�j.dhaIiwaI@norcaIoffice.corn>; Saetern, Kristina Gaen [EHD] <Lsaetern sjgov.o g>; SeanMurphy <br /> <Sean @tccontractors.corn>; s.mann@norcaloffice.com <s.rnann@norca1office.corn>; <br /> alex.korek@diamondzengineering.com <alex.korek@diamondzengineering.com>; alex.kandathil@mattr.com <br /> <aIex.kandathiI@Mattr.corn>; dennis.hockenberr (@mattr.com <dennis.hockenberr @rnattr.corn>; <br /> robert.dubois@mattr.com <robert.dubois@rnattr.corn>; michel le.reed@ mattr.corn <rnichel le.reed@ mattr.corn>; <br /> car etter@rnattr.corn <carv.etter(@mattr.corn>; david.beard,@mattr.com <c1avid.beard@rnattr.corn>; <br /> patrick(@bostonmcdermott.com <patrick@bostonrncdermott.corn>; stefanfibe glassunlimitedinc@gmaii.com <br /> <stefanfiberglassunlimitedinc@gmail.com> <br /> Subject: SR0083837-4607 S. Airport Way, Stockton - Install Repairs <br /> Good afternoon, <br /> Following the repairs that were made to the newly installed, not yet approved underground storage <br /> tanks, our department will be requiring the following inspections in addition to those already listed <br /> on the UST installation approval letter: <br /> 1. Primary tank test of all three tanks in the split tank, in accordance with manufacturer <br /> specifications. <br /> 2. Secondary containment tank test of the split tank (interstice testing), in accordance with <br /> manufacturer specifications, prior to brine filling. <br /> 3. Confirmation of interstice continuity for all three compartments in the split tank. <br /> 4. Secondary piping test: Pressure testing of all piping (product, vapor recovery, vent, and <br /> chase), in accordance with manufacturer specifications. <br /> 5. Integrity testing of all tank top sumps, in accordance with manufacturer specifications. <br />