My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F Series Full-Body FRP Termination <br /> Entry Fittings for Single- or Doublewall <br /> FRP Sumps <br /> & UL 2447 Listed <br /> `r <br /> F Series Full-Body <br /> Flat Sump Wall <br /> Pipe type Part # Description EP1 00 Epoxy <br /> -• • <br /> 3/4" galvanized F-07S-0-F 3/4" galvanized conduit, full-body with duel injection ports, EPDXY 2 <br /> conduit REQ'D <br /> 3/4" PVC coated F-07RS-0-F 3/4" PVC coated condut, full-body with duel injection ports, EPDXY 2 <br /> conduit REQ'D <br /> 3/4" galvanized F-07S-0-DF 3/4" galvanized conduit, doublewall full-body, duel injection ports and 2 <br /> conduit tertiary boot seal, Flat wall FRP, EPDXY REQ'D <br /> 3/4" PVC coated F-07RS-0-DF 3/4" PVC coated conduit, doublewall full-body, duel injection ports 2 <br /> conduit and tertiary boot seal, Flat wall FRP, EPDXY REQ'D <br /> 1 " galvanized F-10S-0-F 1 " galvanized conduit, full-body with duel injection ports, EPDXY 2 <br /> conduit REQ'D <br /> 1 " PVC coated F-10RS-0-F 1" PVC coated conduit, full-body with duel injection ports, EPDXY 2 <br /> conduit REQ'D <br /> 1" galvanized F-10S-0-DF 1" galvanized conduit, doublewall full-body, duel injection ports and 2 <br /> conduit tertiary boot seal, Flat wall FRP, EPDXY REQ'D <br /> 1" PVC coated F-10RS-0-DF 1 " PVC coated conduit, doublewall full-body, duel injection ports and 2 <br /> conduit tertiary boot seal, Flat wall FRP, EPDXY REQ'D <br /> 3/4 brass ground- F-07-GR 3/4" brass grounding rod, full-body with brass conductor and clamps, 2 <br /> ing rod EPDXY REQ'D <br /> 3 x 2" FRP F-32S-T-F 3x2" FRP, full-body taper by slip; dual test ports and single injection 2 <br /> port, EPDXY REQ'D <br /> 4 x 3" FRP F-43S-T F 4x3" FRP, full-body taper by slip; dual test ports and single injection 3 <br /> port, EPDXY REQ'D <br /> 6 x 4" FRP F-64S-T-F 6x4" FRP, full-body taper by slip; dual test ports and single injection 3 <br /> port, EPDXY REQ'D <br /> 3 x 2" FRP F-32A-T-F 3x2" FRP, adjustable full-body taper by slip; dual test ports and single 3 <br /> injection port, EPDXY REQ'D <br /> 4 x 3" FRP F-43A-T-F 4x3" FRP, adjustable full-body taper by slip; dual test ports and single 3 <br /> injection port, EPDXY REQ'D <br /> 116 sbravo.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.