Laserfiche WebLink
Thanks <br /> Latham <br /> Get Outlook for iOS <br /> From: Robert Dubois<Robert.Dubois@ mattr.com> <br /> Sent:Tuesday,August 13, 2024 1:15:13 PM <br /> To: LathamZubillaga <Latha n@tccontractors.com> <br /> Cc: Dennis Hockenberry<dennis.hockenberr mattr.com>; Stefan Thorsteinson <br /> <stefan.thorsteinson@mattr.com>;Alex Kandathil <Alex.Ka nclathil @ mattr.com>; Cary Etter <br /> <cary.etter@mattr.com>; Chelsea Hoops<Chelsea.Hoo Ds@mattr.com>;Jason Turner<Jason.Turner@mattr.com>; <br /> SeanMurphy<Lean @Iccontractors.com>; Patrick McDermott (patrick@bostonmcdermott.com) <br /> <patrick bostonmcdermott.com>; Sean M u rphy<Lean@ <br /> I Iccontractors.com>; Kevin Amick <br /> <KAmick@ShieldsHarper.com>; MiguelCeja <Miguel@tccontractors.com> <br /> Subject: 240813-1- (Dispatch)-Stockton Arco-TCC-Stockton, CA-Brine Weep <br /> Hello Latham , <br /> th <br /> I am confirming the schedule for Wednesday August 14 <br /> Our tech will arrive on site at 7 AM. <br /> To address your concern about exposed fibreglass, if a tank is exposed to sunlight (ultraviolet rays, or UV rays) <br /> over a period there could be a color change due to the dye that we use in our manufacturing process. The color <br /> change will not affect the performance of the tank, and is not a concern to the tank manufacturer, provided that <br /> the tank passes all applicable onsite preinstallation testing per the Installation Manual and Operating Guidelines <br /> for Fiberglass Underground Storage Tanks (IMOG). <br /> The project#and scope are as follows. <br /> Please confirm the site address and contact details below. <br /> The designated site contact will also be requested to act as support to our tech in the event an emergency arises <br /> that requires a competent person to call 911. <br /> Also attached are the Owner Responsibilities. Not all apply,(Please see items 4,6,10 thru 14). <br /> Please ensure requirements are met along with: <br /> 1. Area surrounding the damaged rib to be clean, clear, and free from dirt and debris. <br /> 2. Heating and or hoarding if a minimum of 50' F is not obtainable for FRP cure. <br /> 3.Towable compressor is not required. <br /> Project#F240813-1 <br /> SCOPE <br /> -Attend site to repair brine weep from annular rib. <br /> - Return trip to be scheduled for inspection of tank interior for brine in DEF primary. <br /> - no testing required. <br /> SITE ADDRESS <br /> Stockton Arco <br /> 4607 S Airport Way <br /> Stockton, CA. <br /> 95206 <br /> Contact <br />