My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> Red Thread TI IIA, Dua[oyT"`3000/L&3000/LCX Installation Checklist R <br /> lull <br /> .NDL. <br /> General <br /> Red Thread I A Du a 1oy3000/L&3000/LCXUL/ULC Listed primary and second a rypipingsystems are rated to <br /> the fo I[owing maximum operating ratings: <br /> Primary:2"@ 250 psig;3"@ 175 psig;4"@ 125 psig Secondary:3"-4"@ 50 psig;6"@ 20 psig <br /> Owner/Operator(please print&sign name) <br /> Owner&StoreNo. AKm sowt� ArA*f-T i-Avc- JobSiteAddress qw o,,-rk A;#,Po9,-r LAIJC STOCkT04 CA <br /> OwnerSite Representative Se,4A) Mup-Pdj Signature <br /> Installation Company and Address--rOWNI*C owjVq CooTAAr-roks 3W 6 L-%A4LkQC1 Dk� P-Aoc�� Coa-WVA cAr <br /> Installation Foreman AZ%c-L F)Agkw�s Signature <br /> Installation Date(s) Ajou-1- 117,5 2-q <br /> Review the important Notice Section on page 2 before completing <br /> Pre-Instaltation Checklist(indicate date verified after each item) Installer's Foreman Owner/Operator Rep. <br /> Installer shall show evidence that: <br /> 1. He/She is licensed or certified by the state implementing agency(where applicable). b 17, <br /> 2. Each bonder on site is current in his/her manufacturer's training(recommended every 3 years). <br /> Installer has current manufacturer's installation instructions: <br /> Installation manual number-TAS-L&LO ManualDated 1012016 <br /> Pipe&fittings have U L(Underwriters'Laboratories)or ULC(Canada)label.NOTE:label maybe located on the box for some <br /> fittings. <br /> Pro pe r too Is a n d ad hesive a re o n-site per m a n uf a ctu rer's recom men clatio ns. <br /> Pipe&Fittings inspection: <br /> 1.Impactor puncture Cut out.See Footnote 1 for repairs. <br /> 2. Damaged tapers Cutoff and re-taper. <br /> 3.Check bonding surfaces for ultraviolet weathering degradation. <br /> 4. Replace any missing pipe end caps to protect tapers until time to install. <br /> Trench: <br /> 1.Allow for minimum of 6"bedding material. <br /> 2. Have required slope per owner's design documents or local requirement. lq� vwy <br /> 3.Width:Allow for4"minimum separation between pipes and 6"minimum from trench walls. <br /> Approved backfill(NO native so![): <br /> 1.Provide backfill per owner's design documents;or at a minimum: <br /> 2.Clean washed sand,or <br /> 3. Pea gravel-1/8"to 3/4"particle size,or AS q12412,1 <br /> 4.Refer to Footnote 1 for other backfill materials. <br /> Installation Procedures(Indicate date verified after each item) <br /> 1.6"of approved bedding material. <br /> 2. Dry f it system prior to adhesive bonding.See Footnote 1. <br /> 3. Heat assist required for adhesive curing when temperature is below 507(10'C).See Footnote 1. <br /> 4.A minimum separation of 4"between pipe runs and 21/2"on crossovers. <br /> 5.Bedding/backfill supports pipe completely on runs and crossovers. <br /> 6. Minimum of 6"approved backfill cover material or more as required by local authorities or design documents. <br /> 7. If surface is unpaved,a minimum of 18"of approved backfitl(for 2"pipe)is required.See Footnote 1. <br /> Inspection and Testing(indicate date verified after each item) <br /> 1.Cocked joints(misaligned tapers).See Footnote 2. <br /> 2.Joint Back off,See Footnote 2. <br /> 3.Check for proper cure of adhesive bond.See Adhesive Kit instructions. <br /> 4.Test piping system in accordance with manufacturer's recommendations or local requirements,See Footnote 3. <br /> 5.Secondary containment piping,See Footnote 1. <br /> See Footnotes on fo((owing page <br /> Completion& <br /> Fiber Glass Systems I KOYProduction Solutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.