My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK INSTALLATION CHECKLIST <br /> bo 110 Y_ D6F <br /> INSTAWNG TANKS(See Sections 5 and 7) 1ANK#1 TANK#2 TANK#3 TANK#A <br /> Record tank diameter measurement#1 (before installation) 12q <br /> Record fi nal backf i I I beddi ng depth u nder tan k-inches o r centimeters <br /> Record final tank spacing between tanks-inches or centimeters <br /> L <br /> Record final tank spacing from tank endcap to excavation walls-inches; <br /> or centimeters <br /> 1 24 <br /> If applicable,cleadmen used-factory-supplied o.r other q <br /> If applicable,anchoring hardware-factory-supplied or other <br /> n�_ <br /> Record diameter measurement#2(after straps are installed) NO <br /> Subtract diameter measurement#2 from#1 and record <br /> Deflection measurement meets Table 1-6 requirements-yes or no <br /> Voids under tank between ribs and under domes filled with backfill It <br /> and tamped-yes or no <br /> Backfill placement and compaction meet requirements-yes or no <br /> Piping connections meet requirements-yes or no <br /> 44 1 <br /> Fittings and other metal components are coated for corrosion <br /> protection - yes or no <br /> Record diameter measurement#3(after backfilling to top of tank is <br /> co m plete) z' 11 123-+A' <br /> Subtract diameter measurement#3 from#1 and record <br /> Deflection measurement meets Table 1-6 requirements-yes or no <br /> ITank was ballasted prior to bringing backfill to top of tank-yes or no I <br /> After backlilling is brought to top of tank(See Sections 5,6 and 8) <br /> Tank was ballasted after bringing backfill to top of tank-yes or no <br /> i <br /> Postinstallation tests were conducted for pressure-testable tanks-yes <br /> o-r no I V T;1 ,o�l <br /> If applicable,optional hydrostatic test was performed-yes or no I <br /> If applicable,containment sump test was successful-yes or no <br /> Record final depth of backfill over tank-give in inches or centimeters i <br /> Record diameter measurement#4(after backfilling is brought to <br /> subgrade) <br /> Subract diameter measurement#4 from#1 and record <br /> Final deflection measurement meets requirements of Table 1-6-yes <br /> or no <br /> If applicable,type of surface pad used-concrete or asphalt <br /> i <br /> If applicable,thickness of surface pad used-give in inches or <br /> centimeters and note which type <br /> If applicable,record monitoring fluid level when backfilling&top slab <br /> installation are complete <br /> 38 XERXES <br />
The URL can be used to link to this page
Your browser does not support the video tag.