Laserfiche WebLink
$ XE RXES CR <br />• Approximately 252 gallons of brine were introduced into the interstice and monitored <br />overnight with no significant loss. <br />• Xerxes completed work and exited the site on June 17, 2025, following turnover to the <br />contractor and owner. <br />3. Testing and Validation <br />Final validation included: <br />• 5 psi pneu mat i c t est of primaries <br />• Vacuum testing of the interstice (prior to brine fill) <br />• 5 prig pneumatic test of interstice (prior to brine fill) <br />• 2 psi over brine in interstice <br />• Reintroduction of brine (signed statement attached) <br />• Truchek testing (report attached) <br />• Confirmation of interstitial fluid communication <br />All results demonstrated full restoration of containment integrity. <br />4. Compliance and Warranty <br />• All repairs were performed in accordance with Xerxes Installation Manual and Operating <br />Guidelines(IMOG). <br />• UVULGlisted materialsand certified repair procedureswere used. <br />• The tank remains covered under the original warranty. <br />• Repairs carry an additional one-year warranty for materials and workmanship. <br />