My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 8:57:09 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
813
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT <br />I, Daniel Garcia, confirm that the original factory brine (supplied by Xerxes at the time of installation <br />and is Calcium Chloride Brine 30%) removed from the tank interstice at the start of the repair on <br />[Date] by drilling a hole on the inside and bottom of the primary tank. The brine was retained in clean <br />55-gallon nonreactive drums and kept in secure storage for the duration of the work. Upon <br />completion of the repair, on June 17 2025, 1 was responsible for reintroducing the retained brine into <br />the tank interstice. All the brine removed and stored was added back to the interstice. At that time, <br />additional brine supplied by Xerxes labeled "C450001 Calcium Chloride, Brine 30%" was also <br />introduced to achieve the required interstice level. All handling and reintroduction activities were <br />performed in accordance with established procedures and without incident. <br />M & r-- <br />Daniel Garcia (Oct 31, 2025 07:27:53 PDT) <br />Technician Name: Daniel Garcia <br />Company: Fiberglass Unlimited Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.