My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 8:57:09 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
813
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$ XE RXES CR <br />• Approximately 252 gallons of brine were introduced into the interstice and monitored <br />overnight with no significant loss. <br />• Xerxes completed work and exited the site on June 17, 2025, following turnover to the <br />contractor and owner. <br />3. Testing and Validation <br />Final validation included: <br />• 5 psi pneu mat i c t est of primaries <br />• Vacuum testing of the interstice (prior to brine fill) <br />• 5 prig pneumatic test of interstice (prior to brine fill) <br />• 2 psi over brine in interstice <br />• Reintroduction of brine (signed statement attached) <br />• Truchek testing (report attached) <br />• Confirmation of interstitial fluid communication <br />All results demonstrated full restoration of containment integrity. <br />4. Compliance and Warranty <br />• All repairs were performed in accordance with Xerxes Installation Manual and Operating <br />Guidelines(IMOG). <br />• UVULGlisted materialsand certified repair procedureswere used. <br />• The tank remains covered under the original warranty. <br />• Repairs carry an additional one-year warranty for materials and workmanship. <br />
The URL can be used to link to this page
Your browser does not support the video tag.