My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR0543692
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:14:30 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR0543692
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0024830
FACILITY_NAME
ARCO
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17746013
CURRENT_STATUS
Temp inactive, non-billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />1 <br />1301 Academy Ct. <br />Fort Collins, CO 80524 <br />www.cgrs.com <br />800.288.2657 <br /> <br /> <br /> <br /> <br /> <br /> <br />Subject: Work Plan for IOTA v005® and iotaVision™ Pre and Final ELD Testing Services <br />To Whom It May Concern: <br />CGRS is pleased to present you with this work plan for pre and final enhanced leak detection (ELD) testing services for your <br />project at the above referenced location. CGRS will utilize the iota VaporTite V005 and iotaVision™ L005 (LG 113) to <br />perform the final ELD post installation test as required by the State of California. These test methods have been evaluated <br />by the California State Water Resource Control Board and determined to meet the performance requirements for post <br />installation ELD testing (see LG 162-3 attached). <br />o Pre Testing will be performed on the primary containment portion of the fueling system with the IOTA test method <br />while the tank top and product, vent and vapor piping is exposed, prior to backfilling. Any problems encountered <br />during the pre-testing will be addressed by the installation contractor and retested by CGRS the testing crew. <br />o Final ELD testing will be performed on all primary fuel containment system components once the fueling system <br />has been completed (everything below grade surface) backfilled, concrete poured, and the system is essentially <br />ready to receive fuel. This will provide the installation contractor, general contractor, design engineer, site owner <br />and operator with third party certification that the system is “vapor tight” before it ever receives fuel. <br />o Final testing with iotaVision™ will be performed on all brine filled underground storage tanks and their <br />compartments thus ensuring that brine is not observed in the primary containment. <br /> <br />CGRS holds a current California Contractors License with a Hazardous Materials endorsement. All final ELD testing will be <br />performed by a certified IOTA technician holding a current California Tank Tester license. <br />If you have any questions regarding any aspect of this work plan, please don’t hesitate to contact me at 1-800-288-2657. <br />Sincerely, <br /> <br />Chris Murphy <br />Director of CA Operations <br />CGRS, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.