My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 8:57:09 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
813
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOA UIN <br />COUNT <br />G'rratrress grows here, <br />Environmental Health Department <br />Service Request Inspection Report <br />Name of Facility: ARCO <br />Date: 12/15/2025 <br />Address: 4607 S AIRPORT WAY, STOCKTON 95206 <br />Requestor: <br />Telephone: () - <br />Program Element: 2303 - UST/PIPING INSTALLATION <br />Request #: SR0083837 <br />Inspection Type: 131 - UST INSTALLATION INSPECTION <br />Onsite Service Technician: Ryan Frederickson <br />ICC Service Tech/Installer Exp. Date: 12/03/2026 <br />Manufacturer training: VR, 12/02/26; VMI, 11/22/26 <br />OVERALL INSPECTION NOTES AND COMMENTS <br />NOTES <br />- Reviewed vacuum zone volume programming - not accurate <br />- Reviewed leak detector line length programming - not accurate <br />- Verified deflector plates are installed on UDC 17/18, 18/19, and 19. <br />Notes: <br />- Tank top sump gaskets installed properly per manufacturer installation. Gasket on the 91 STP sump tank top was adllusted. <br />- Adhesive oBserved on several sump electrical penetrations was not the color of the Hravo and NOV adhesive used on other <br />penetrations. The Penetrations were a pale cream color. Provide manufacturer information and approval for this adhesive. <br />- H2O was not oBserved on site. The tank approved for storage of H2O was laBeled as RenewaBle Diesel. Update CERS with <br />accurate storage information. <br />- The panel contained inaccurate PLLD line length information and inaccurate vacuum sensor zone volume information. An <br />updated system setup was provided at the end of inspection. This information will need to Be reviewed and verified as accurate By <br />EJ D. <br />This facility is approved to receive fuel. <br />This facility is NOT approved to operate. <br />Additional inspections are required. Referred to the approval letter dated ®ne 14, 2024, for a full list of outstanding requirements. <br />Please suBmit inspection requests in writing to USTj stgov.org with 48 hours advance notice. <br />The person in charge is responsiBle for ensuring that the aBove mentioned facility is in compliance with all applicaBle sections of the California J ealth and <br />Safety Code. If a reinspection is required, fees will Be assessed at the current hourly rate. <br />Received By: <br />EJ Specialist <br />KRISTINA SAETERN <br />Name and Title: mailed to C(aDhaliwal, Owner <br />Phone: (209) 616-3045 <br />FA0024830 SR0083837 SC131 12/15/2025 <br />EJ D Rev. 09/16/2020 Page 1 of 1 Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.