My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 8:57:09 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
813
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mt Outlook <br />Re: SR0083837 - 4607 S Airport Way - UST Installation Inspection Checklist Needed <br />From Gurkamal Dhaliwal <g.dhaliwal@norcaloffice.com> <br />Date Fri 12/19/2025 1:36 PM <br />To Saetern, Kristina Gaen [EHD] <ksaetern@sjgov.org> <br />Cc CJ Dhaliwal <cj.dhaliwal@norcaloffice.com>; Rivera, Stacy [EHD] <srivera@sjgov.org> <br />Hi Kristina, <br />just submitted payment. Sean is sending another as -built to me and you shortly and the Veederroot <br />will be corrected on Monday by IEC. I can scan you the print out as soon as it is done. <br />Thanks, <br />Gurkamal Dhaliwal I Director of Development <br />Elite Business Enterprises, Inc. <br />2190 Meridian Park Blvd, Suite G, Concord, CA 94520 <br />0: +1 (925) 446-6806 1 F: +1 (925) 446-6808 1 C: +1 (901) 383-3023 <br />E: g.dhaliwat@norcaloffice.com <br />On Fri, Dec 19, 2025 at 12:28PM Saetern, Kristina Gaen [EHD] <ksaetern@sigov.org> wrote: <br />Hello, <br />Please see the EHD response and notes that are needed to be addressed below. See the attached Veeder Root <br />set up with notes as well. <br />6q) Verification of accurate vacuum zone programming, including monitored volumes. <br />Veederroot print out attached. We will need re -inspection once reviewed. <br />EHD Response: Not Accepted. Please provide the most updated alarm history. The provided alarm <br />history a range from 12/10/2025. The Line volumes are not consistent with the as build plans that were <br />provided. These volumes should reflect the longest chase and longest vent pipeline. <br />6r) Leak detector test, after first fuel delivery. Line volumes verification are needed. <br />Veederroot print out attached. We will need re -inspection once reviewed. <br />EHD Response: Not Accepted. The PLLD length are not accurate. The premium appears to have a longer <br />pipeline base on the as built received. The Regular appears to be shorter base on the as built plans. <br />Please review and ensure the set up is accurate. <br />12a) Accurate and to -scale as -built diagram or drawing <br />Received but needs to be reviewed. - <br />EHD Response: Not Accepted. Please ensure the plans are accurate. Pipelines do not reflect photos. See <br />attached photos. <br />12b) Completed copies of all required installation checklists (tank, etc.) must be submitted to EHD. <br />Received not yet reviewed. - <br />Accepted <br />
The URL can be used to link to this page
Your browser does not support the video tag.