Laserfiche WebLink
Veederroot print out attached. We will need re -inspection once reviewed. <br />EHD Response: Not Accepted. Please provide the most updated alarm history. The provided alarm <br />history is a range date from 12/10/2025. The PLLD length are not accurate. The premium appears to have <br />a longer pipeline base on the as built received. The Regular appears to be shorter base on the as built <br />plans. Please review and ensure the receive is accurate. <br />12a) Accurate and to -scale as -built diagram or drawing <br />Received but needs to be reviewed. - <br />EHD Response: Not Accepted. Please ensure the plans are accurate. Pipe lines do not reflect <br />photos. See attached photos. <br />12b) Completed copies of all required installation checklists (tank, etc.) must be submitted to EHD. <br />Received not yet reviewed. - <br />Accepted <br />12c) All outstanding operating permit and service request fees must be paid prior to receiving the <br />final approval to operate. <br />Paid all other fees but will have checks for 2025 and 2026 tomorrow. <br />Not received. <br />Additional: Verification of CERS submittals need to be accurate and reflect the site. Verification of <br />renewable diesel. <br />Submitted but needs to be reviewed. - Completed <br />Thanks, <br />Gurkamal Dhaliwal I Director of Development <br />Elite Business Enterprises, Inc. <br />2190 Meridian Park Blvd, Suite G, Concord, CA 94520 <br />0: +1 (925) 446-6806 1 F: +1 (925) 446-6808 1 C: +1 (901) 383-3023 <br />E: g.dhaliwalCnorcaloffice.com <br />On Wed, Dec 17, 2025 at4:46PM Saetern, Kristina Gaen [EHD] <ksaetern@sigov.org> wrote: <br />Hello, <br />I've prepared an Installation Inspection list that are still needed in order to obtain operation approval. <br />According to the UST installation list these are still needed: <br />6q) Verification of accurate vacuum zone programming, including monitored volumes. <br />6r) Leak detector test, after first fuel delivery. Line volumes verification are needed. <br />12a) Accurate and to -scale as -built diagram or drawing (Received but needs to be reviewed) <br />12b) Completed copies of all required installation checklists (tank, etc.) must be submitted to EHD. (Received <br />not yet reviewed) <br />12c) All outstanding operating permit and service request fees must be paid prior to receiving the final <br />approval to operate. <br />Additional: Verification of CERS submittals need to be accurate and reflect the site. Verification of renewable <br />diesel. <br />Once completed, approval for operation will be given. <br />