Laserfiche WebLink
CONTACT INFORMATION DRAWING INDEX by <br /> DRAWING INDEX REVISION <br /> COVER AND NOTES NUMBER DATE <br /> CLIENT CONSULTANT CS-0 COVER SHEET 7 6/12/2024 <br /> AIRPORT PETROLEUM, INC. DIAMOND Z ENGINEERING, INC. CS-1 TANK AND PIPING INSTALLATION SCOPE OF WORK 2 2f7l2024 <br /> 2190 MERIDIAN PARK BLVD,SUITE G 5670 STATE ROAD CS-2 TANK AND PIPING INSTALLATION SCOPE OF WORK 2 2/7/2024 <br /> CONCORD,CA 94520 CLEVELAND,OH 44134 MATERIALS <br /> P:440.842.6501 FM-1 MATERIALS LIST 1 4 1 312612024 '` <br /> FM-2 MATERIALS LIST 6 4/5I2024 <br /> LAYOUT <br /> GENERAL NOTES F-1 OVERALL SITE PLAN 2 /26/2 2 " <br /> F-2 AUTO DISPENSER AND TANK WORK AREA 4 3I28/2024 <br /> F-3 TRUCK DISPENSER WORK AREA 3 027/2024 <br /> FA AUTO CONCRETE PLAN 2 2/T/2024 ARCO <br /> 1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL F-5 TRUCK CONCRETE PLAN 2 2tT12024 <br /> DIMENSIONS,PROPERTY LINES,ELEVATIONS AND EQUIPMENT LOCATIONS BP WEST COAST PAOOOCT3, LLC <br /> TANK INSTALLATION DETAILS <br /> 2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE FT-1 24,000/6,000 GALLON UST INSTALLATION 6 W312024 <br /> STARTING ANY WORK.ANY DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS F <br /> ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH THE WORK. T•2 6,000I20,000/6,000 GALLON UST INSTALLATION 6 5/3I2024 <br /> 3. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR FT-3 UST ANCHORING AND SUMP DETAILS 3 2/27/2024 <br /> EXCAVATIONS OF TRENCHES 5'-0"OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO FT-4 TURBINE SUMP DETAILS 7 6/12/2024 <br /> DESCEND. FT-5 FILL SUMP AND INTERSTITIAL MONITOR DETAILS 6 51312024 <br /> 4. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY FT-5.1 FILL SUMP DETAILS 6 5/312024 <br /> GOVERNING AGENCY PRIOR TO TANK OPERATIONS. OFF FT-6 DEF TANK TURBINE SUMP DETAILS 3 2/27/2024 <br /> 5. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER FT-7 DEF REMOTE FILL DETAILS 2 2/7/2024 <br /> NATIONALLY RECOGNIZED CODES,LOCAL CODES AND GOVERNING AUTHORITIES. FT-6 VENT SUMP DETAILS 4 3/26/2024 NO. DATE REHsmN DESMIP11ON <br /> 6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT FT-9 UST GROUNDING DETAILS 2 2/7/2024 0 emToza Pm Mm <br /> STORED. FT-10 UST VACUUM MONITORING DIAGRAM 7 6/12/2024 tQ WWN RMFMFPAHR <br /> 7. ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. DISPENSER INSTALLATION DETAILS Q mane PPnsm PrxcEH.caaimrs <br /> FD-1 AUTO DISPENSER LAYOUT 2 2/7/2024 aamm Rsnsm vvacExcawexrs <br /> 8. GENERAL CONTRACTOR REQUIRED PROVIDE 72 HOUR(TYPICAL)NOTIFICATION TO FD-2 3+0 AUTO DISPENSER DETAILS 3 2/27/2024 oswe Pensm vPAeExmewiExrs GOVERNING AGENCY PRIOR <br /> R TO TANK INSTALLATION. <br /> TALLATION, <br /> FD-3 3+1 AUTO DISPENSER DETAILS 3 2/27/2024 armx Rsnsm vvxcEH.cawvxrs <br /> 9. TANK AND PIPING SYSTEM BE INSPECTED OWNER'S THIRD PARTY INSPECTOR AND ui�m GOVERNING AGENCY AT THREE <br /> CONSTRUCTION(3)SEPARATE CONSTRUCTION PHASES(SEE SPECIFICATIONS): FDA TRUCK DISPENSER ISLAND LAYOUT 2 V7/2024 RansmPRCExcawn <br /> A. TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 <br /> ARCO <br /> MINUTES. FD-5 TRUCK DISPENSER DETAILS 2 2I7I2024 <br /> B. INSPECTION OF ALL SECONDARY CONTAINMENT,INCLUDING TESTING,IN ACCORDANCE FD-6 TRUCK DISPENSER DETAILS 5 4/5/2024 <br /> WITH MANUFACTURER'S GUIDELINES. B P WEST COAST PRODUCTS LLC MISCELLANEOUS DETAILS Aa <br /> C. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM. <br /> FS-1 MISCELLANEOUS DETAILS 2 2/7/2024 ' <br /> 10. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY FS-2 MISCELLANEOUS DETAILS 2 2R/2024 <br /> TESTED(LAKE TEST)WITH STANDING WATER TO TOP OF REDUCING COLLAR FOR A PERIOD OF 24 <br /> HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT.RECORD THE TEST RESULTS AND SUBMIT ELECTRICAL LAYOUT <br /> TO OWNER. PEA AUTO AND TANK HAZARDOUS AREA PLAN 2 2/7/2024 <br /> 11. TANK SYSTEM,LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND FE-2 TRUCK HAZARDOUS AREA PLAN 2 2/7/2024 <br /> APPROVED BY GOVERNING AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION. FE-3 MISCELLANEOUS ELECTRICAL DETAILS 2 2/7/2024 <br /> 12. PRIOR TO FUEL BEING PUMPED,STATION MUST HAVE VEEDER-ROOT FUNCTIONAL AND <br /> MONITORING ANNULAR SPACES OF TANK AND DISPENSER SUMPS. <br /> 13. PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING SAN �OA/ll li�+, /'�O�N-�/JURISDICTION WITHIN 30 DAYS OF THE FINAL INSPECTION. <br /> , DEPARTMENT �"ssRa�Pe <br /> 14. EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY(BY BP). ENVIRONMENTAL HEALTH 1 V V O E. HAZELTON AVE. �+x��. <br /> 15. MEASUREMENTS OF BRINE LEVELS IN TANKS SHALL BETAKEN BY BP REPRESENTATIVE DURING <br /> THREE SEPARATE VISITS TO SITE AND PRIOR TO FUELING OPERATIONS.REFER TO TANK gyp. p > �. <br /> MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR REQUIREMENTS. (209) �8$_3420 uM <br /> STOCi'CTON, CA 95205 <br /> w.vivvrnnxue <br /> r'e 'mcs®w.nwi"i"`,w`*:'rµ,aromosA� <br /> BP A R C O pP � �""m� <br /> ./"� roved r•r:. •Y, mmtaorru,vAs,w�.ePaom,rn <br /> pproved with changes: See Remarks <br /> 4607 S . AIRPORT WAY a Disapproved: See Remarks DEb.m MT wrmuAIM; <br /> Remarks se App\-O\/CA � � �� UNDERGROUND STORAGE <br /> NOTE: STOC KTO N , CA 95206 S� tom. TANKSTANDARDS <br /> ELEMENTTP01 <br /> ANY DEVIATION FROM THE SPECIFIED V-15.0 2023 SERIES <br /> EQUIPMENT & MATERIALS MUST BE APPROVED Date 2 Y '1�� aTE ADDREm <br /> Approve extends on y t wh' is shown and described <br /> PRIOR TO INSTALLATION BY THE OWNER. �m navids, n0t5";.AJI LZ�= �A aUpro Pe any omissioeor 4607 S.AIRPORT WAY <br /> STOCKTON,CA 95206 <br /> LEGEND LOCATION MAP TANK EXCAVATION NOTE ONE CALL AAK AWAMZADN: <br /> CAUTION:POTENTIAL UTILITY CONFLICT.CONTRACTOR SHALL FIELD VERIFY ALL EXISTING AND NEW NAM ft TAF AWAKE PN: <br /> SITE LOCATION UTILITIES PRIOR TO CONSTRUCTION.SEE UTILITY CONFLICT NOTE THE EXISTING WATER,STORM, T e Mom: moccr xa <br /> O EQUIPMENT IDENTIFIER ® UNDISTURBED SOIL AND SANITARY SEWER SERVICE SHOWN IS APPROXIMATE,BASED ON FIELD SURVEYS AND"AS-BUILT" DIGO <br /> CA-4795 <br /> , RECORDS.THE GENERAL CONTRACTOR SHALL"POTHOLE"THE EXISTING UTILITIES TO VERIFY THEDIAMETER AND LOCATION(INCL.ELEVATIONS)PRIOR TO CONSTRUCTION.ANY DISCREPANCIES IN DRATANcXDETAIL IDENTIFIER PEA GRAVEL THE LOCATION OF THE EXISTING PIPE OR INCOMPATIBILITY OF THE DESIGN SHALL BE BROUGHT TO ��� . 1AkM <br /> e „ THE IMMEDIATE ATTENTION OF THE OWNERS REPRESENTATIVE,AND OWNERS CIVIL ENGINEER. <br /> 0 CONCRETE COVER SHEET <br /> FSC FUEL SYSTEM CONTRACTOR UTILITY CONFLICT NOTE <br /> . CAUTION:THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,DIMENSION, WMT No: <br /> ® CATCH BASIN N AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POT HOLING <br /> THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO <br /> DEF DIESEL EXHAUST FLUID ® s,«u", CONSTRUCTION.THIS SHALL INCLUDE CALLING UTILITY LOCATE Q 1(800)227-2600 AND THEN POT O <br /> MANHOLE °"" HOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY <br /> VERIFY WHETHER OR NOT CONFLICTS EXIST.LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE <br /> PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION.IF <br /> El-0 LIGHT POLE CONFLICTS SHOULD OCCUR,THE CONTRACTOR SHALL CONSULT THE OWNERS CIVIL ENGINEER TO <br /> RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />