My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BESSEMER
>
1019
>
2800 - Aboveground Petroleum Storage Program
>
PR0515715
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 2:45:36 PM
Creation date
7/30/2024 12:46:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0515715
PE
2832
FACILITY_ID
FA0010328
FACILITY_NAME
MOUNTAIN VALLEY EXPRESS INC
STREET_NUMBER
1019
STREET_NAME
BESSEMER
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22104067
CURRENT_STATUS
01
SITE_LOCATION
1019 BESSEMER AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
View images
View plain text
A dOAQU1N Environmental Health Department <br /> COUNTY <br /> CP22 - AST Non-Qualified Inspection Report <br /> Facility Name: Facility Address: Date: <br /> MOUNTAIN VALLEY EXPRESS INC 1019 BESSEMER AVE MANTECA June 20 2024 <br /> 86 4045-Release/Leaks/Spills-General Local Ordinance ❑OUT ❑R ❑COS <br /> 87 See below 4050-Abandonment/Illegal Disposal/Unauthorized Treatment-General ❑OUT ❑R ❑COS <br /> 88 4055-Abandonment/Illegal Disposal/Unauthorized Treatment-General Local Ordinance ❑OUT ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS Il,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 7 Code of Fed Regulations 112.5(a), 112.5(b)4010010- Facility has amended SPCC as necessary. <br /> OBSERVATION:The facility failed to amend the Spill Prevention, Control, and Countermeasure(SPCC) Plan within six <br /> months of when there was a change in design, construction, operation, or maintenance, which affects the facility's <br /> discharge potential. Observed and per Dan Souza, single-walled motor oil tank had been replaced with a double-walled <br /> motor oil tank. <br /> REGULATION GUIDANCE: (a)Amend the SPCC Plan for your facility in accordance with the general requirements in <br /> § 112.7, and with any specific section of this part applicable to your facility,when there is a change in the facility <br /> design, construction, operation, or maintenance that materially affects its potential for a discharge as described in § <br /> 112.1(b). <br /> CORRECTIVE ACTION: Ensure that the SPCC Plan has been amended, as required, and it accurately represents <br /> facility design, procedures, and policies currently in place. Provide proof of correction to the EHD. <br /> This is a repeat violation (Class 2) Violation. <br /> 10 Code of Fed Regulations 112.5(b)4010009-5 year review performed on SPCC and documented. <br /> OBSERVATION:The facility failed to perform the 5-year review of the SPCC plan. The Spill Prevention, Control, and <br /> Countermeasure(SPCC) Plan was last reviewed in January 2016. <br /> REGULATION GUIDANCE: (b) Notwithstanding compliance with paragraph [112.5] (a)of this section, complete a <br /> review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to <br /> this part; or, if your facility was in operation on or before August 16,2002,five years from the date your last review was <br /> required under this part.As a result of this review and evaluation,you must amend your SPCC Plan within six months <br /> of the review to include more effective prevention and control technology if the technology has been field-proven at the <br /> time of the review and will significantly reduce the likelihood of a discharge as described in§ 112.1(b)from the facility. <br /> You must implement any amendment as soon as possible, but not later than six months following preparation of any <br /> amendment. You must document your completion of the review and evaluation, and must sign a statement as to <br /> whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. The <br /> following words will suffice, "I have completed review and evaluation of the SPCC Plan for(name of facility)on (date), <br /> and will (will not)amend the Plan as a result." <br /> CORRECTIVE ACTION: Immediately complete and document the 5-year review of the SPCC Plan and make any <br /> necessary amendments(a Professional Engineer must certify any technical amendments). Submit verification of <br /> adequate SPCC plan review completion to the EHD. <br /> This is(Class 2)Violation. <br /> 11 Code of Fed Regulations 112.7 4010012-SPCC in writing,follows code seq/cross ref, good eng practice, mgt <br /> approval, items not in place. <br /> OBSERVATION:The Spill Prevention, Control, and Countermeasure(SPCC)Plan reviewed at the time of inspection, <br /> updated 10 June 2019, did not follow the order or requirements of 40 CFR Part 112.7. SPCC Plan doesn't follow the <br /> FA0010328 PR0515715 SCO01 06/20/2024 <br /> EHD Rev.12/06/2021 Page 5 of 7 CP22-AST Non-Qualified OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).