Laserfiche WebLink
jz7�- <br /> Are all valves free of leaks, corrosion and other <br /> damage?Follow manufacturers' instructions for <br /> regular maintenance of these items. Check the <br /> following and verify(as applicable): <br /> ❑Anti-siphon valve El Yes ❑No XN/A <br /> 16 ❑Check valve El Yes ❑No El N/A <br /> ❑Gate valve ❑Yes []No E-1 N/A <br /> ❑ Pressure regulator valve ❑Yes ❑No El N/A <br /> ❑Expansion relief valve ❑Yes ❑No El N/A <br /> ❑Solenoid valve <br /> ❑ Fire valve XYes ❑No ❑N/A <br /> ❑Shear valve des ❑No <br /> 17 Are strainers and filters clean and in good condition? ❑Yes ❑NO ❑N/A <br /> Insulated Tanks <br /> Free of missing insulation? %Yes ❑No El N/A <br /> 18 Insulation free of visible signs of damage? <br /> Insulation adequately protected from water intrusion? <br /> 19 Insulation free of noticeable areas of moisture? Yes ❑NO ❑N/A <br /> 20 Insulation free of mold? Lsil'es El No El N/A <br /> 21 Free of visible signs of coating failure? <br /> Ales ❑No ❑N/A <br /> ank I Piping Release Detection <br /> 22 Is inventory control being performed and documented 54Yes ONO El N/A <br /> if required? <br /> 23 Is release detection being performed and documented 54:Yes ❑NO ❑N/A <br /> if required? <br /> Other Equipment <br /> 24 Are electrical wiring and boxes in good condition? XYes ❑NO ❑N/A <br /> Has the cathodic protection system on NO �N/A <br /> 25 the tank been tested as required by <br /> the designing engineer? <br /> Annual Checklist Page 3 of 4 <br />