Laserfiche WebLink
Liquid level gauge has been installed on diesel tank. <br /> __ r <br /> Dirt, weeds, and debris were removed. Drainpipe in containment wall was removed and sealed with <br /> concrete. Extra laver of concrete was poured in the cut-out square to ensure it is impervious. <br /> 01. <br /> 5: <br /> SPCC Review Date has been updated. <br /> Date of SPCC Plan Certification or Date of 5-Year Review=F�,. <br /> M V2024 <br /> Created By:Jon Freitas on 7111=4 Z13 Phil <br /> Last Lkxated By:Jon Fngbs cn 7112J2024 1G:32AIM <br />