Laserfiche WebLink
A dOAQU1N Environmental Health Department <br /> CQLJIVTY AMENDED <br /> 6/26/2024 <br /> CP22 - AST Non-Qualified Inspection Report <br /> Facility Name: Facility Address: Date: <br /> CALPORTLAND COMPANY- LATHROP READY 1945 LATHROP RD, LATHROP June 21 2024 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> discharged oil. Dikes, containment curbs, and pits are commonly employed for this purpose. You may also use an <br /> alternative system consisting of a drainage trench enclosure that must be arranged so that any discharge will <br /> terminate and be safely confined in a facility catchment basin or holding pond. <br /> CORRECTIVE ACTION: Ensure that all containment systems are sufficiently impervious to contain oil. <br /> This is (Class 2)Violation. <br /> 59 Code of Fed Regulations 112.7(a)(1), 112.8(c)(8)4010056-SPCC adequately describes overfill prevention methods, <br /> and devices/systems used for each container. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC) Plan failed to adequately describe the <br /> overfill prevention methods, including a description of the devices or systems in place for each container to prevent <br /> overfills. <br /> -The SPCC plan mentions presence of liquid gauge as overfill prevention but facility did not have liquid gauges. <br /> REGULATION GUIDANCE: 112.7 (a)(1) Include a discussion of your facility's conformance with the requirements listed <br /> in this part[§112.7]. 112.8(c)(8) Engineer or update each container installation in accordance with good engineering <br /> practice to avoid discharges. You must provide at least one of the following devices: (i) High liquid level alarms with an <br /> audible or visual signal at a constantly attended operation or surveillance station. In smaller facilities an audible air <br /> vent may suffice. (ii) High liquid level pump cutoff devices set to stop flow at a predetermined container content level. <br /> (iii) Direct audible or code signal communication between the container gauger and the pumping station. (iv) A fast <br /> response system for determining the liquid level of each bulk storage container such as digital computers,telepulse, <br /> or direct vision gauges. If you use this alternative, a person must be present to monitor gauges and the overall filling of <br /> bulk storage containers. (v)You must regularly test liquid level sensing devices to ensure proper operation. <br /> CORRECTIVE ACTION: The SPCC plan shall adequately address overfill prevention methods, including a description <br /> of the devices or systems in place for each container to prevent overfills. Provide proof of correction to the EHD <br /> This is(Minor)Violation. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by 7/21/24 . <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead of <br /> having them sign. Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate ($162). <br /> To schedule an appointment, please call (209)468-3420.An inspection report was provided to the facility operator <br /> on the day of inspection. <br /> ***The report was amended and replaces the initial report. Complete and submit a copy of the Return to <br /> Compliance Certification form to the EHD with a statement documenting the corrective actions that have been or <br /> will be taken for each violation, and any supporting paperwork, within 30 days of receiving the amended inspection <br /> report.*** <br /> FA0009397 PR0516365 SCO01 06/21/2024 <br /> EHD Rev.12/06/2021 Page 6 of 7 CP22-AST Non-Qualified OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />