Laserfiche WebLink
Environmental Health Department <br />CP22 - AST Non-Qualified Inspection Report <br />19 4010043 - SPCC Plan addresses disposal methods for recovered materials □ OUT <br />20 4010017 - SPCC contains procedures for reporting a discharge <br />21 <br />22 <br />23 □ OUT <br />24 <br />25 □ OUT <br />26 <br />27 □ OUT <br />28 <br />29 4010023 - Employee training and spill prevention briefings discussed in SPCC plan <br />30 <br />31 OUT <br />32 <br />33 <br />34 <br />35 OUT <br />36 <br />37 <br />38 <br />39 <br />FA0009252 PR0523227 SC001 06/12/2024 <br />EHD Rev. 12/06/2021 CP22 - AST Non-Qualified OIRPage 2 of 9 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD <br />Date: <br />June 12, 2024 <br />SANJOAOUIN <br />COUNT V <br />4010005 - If claiming impracticability of containment/diversionary items a contingency plan has <br />been Included______________________________________________________________ <br />4010006 - If claiming impracticability written commitment of manpower, equipment, and materials <br />provided <br />Facility Name: <br />California Materials, INC <br />18 <br />4010024 - SPCC addresses security measures-lighting. access to handling/storage, <br />valves/pumps/lransfer equip_________________________________________________ <br />4030001 - Handling areas, valves, pumps/starter controls, load/unload connections secured, <br />lighting adequate_________________________________________________________ <br />4010025 - SPCC adequately discusses facility tank car and tank truck loading/unloadlng rack <br />4030002 ■ Loading rack containment has capacity to contain single largest compartment of tank <br />car/truck_________________________________________________________________ <br />4030003 - Vehicular departure warning system in place at facility with a loading/unloadlng rack <br />4010040 - Documented evaluation of field-constructed tanks for risk of discharge due to brittle <br />fracture_________________________________________________________________ <br />4030016 - Brittle fracture evaluation of field-constructed aboveground tanks performed <br />4020001 - Training provided for op/maint of equip, discharge procedures, laws/regs, general fac <br />ops, and SPCC <br />4010022 - Person has been designated as accountable for discharge prevention and reports to <br />management______________________________________________________________ <br />4020002 - Spill prevention briefings are conducted annually <br />Facility Address: <br />________________________ 3736 S HWY 99 , Stockton____________ <br />4010042 - SPCC Plan addressed countermeasures for discharge discovery, response and <br />cleanup <br />4010018 - SPCC organized so discharge procedures are readily usable if the facility has no <br />response plan _________________________________________________________ <br />4010019 - SPCC predicts direction, rate of flow, total quantity of oil that could be released from a <br />discharge _____________________________________________________________ <br />4010020 - SPCC addresses the appropriate general containment/diversionary <br />structures/equipment________________________________________________________ <br />4030037 - Appropriate (general) containment/diversionary structures/equipment have been <br />provided__________________________________________________________________ <br />4010004 - Impracticability of containment/diversionary items, if claimed, is PE demonstrated and <br />certified__________________________________________________________________ <br />4030033 - Periodic integrity/leak testing performed with impracticability claim <br />Code of Fed <br />Regulations 112.7(a)(3) <br />(w)_______________ <br />Code of Fed <br />Regulations 112.7(a)(3) <br />(v)________________ <br />Code of Fed <br />Regulations 112.7(a) <br />(3vi), 112,7(a4) <br />Code of Fed <br />Regulations 112.7(a)(5) <br />Code of Fed <br />Regulations 112.7(b) <br />Code of Fed <br />Regulations 112.7(c) <br />Code of Fed <br />Regulations 112.7(c) <br />Code of Fed <br />Regulations 112.7(d) <br />Code of Fed <br />Regulations 112.7(d), <br />25270.4.5(a)________ <br />Code of Fed <br />Regulations 112.7(d)(1) <br />Code of Fed <br />Regulations 112.7(d) <br />(2), 25270.4.5(a) <br />Code of Fed <br />Regulations 112.7(f)(1), <br />112.7(f)(3)__________ <br />Code of Fed <br />Regulations 112.7(f)(1) <br />Code of Fed <br />Regulations 112.7(f)(2) <br />Code of Fed <br />Regulations 112.7(f)(3) <br />Code of Fed <br />Regulations 112.7(g) <br />Code of Fed <br />Regulations 112.7(g) <br />Code of Fed <br />Regulations 112.7(h) <br />Code of Fed <br />Regulations 112.7(h)(1) <br />Code of Fed <br />Regulations 112.7(h)(2) <br />Code of Fed <br />Regulations 112.7(1) <br />Code of Fed <br />Regulations 112.7(i), <br />25270.4.5(a) <br /> R COS <br />□ OUT □ R □ COS <br />□ OUT □ R □ COS <br />□ R □ COS <br />□ OUT □ R □ COS <br />□ OUT oR □ COS <br />■ OUT □ R □ COS <br />□ R □ COS <br />□ OUT R COS <br />□ OUT □ R □ COS <br />□ R □ COS <br />□ R □ COS <br />□ OUT oR □ COS <br />□ OUT oR □ COS <br />□ OUT □ R □ COS <br />□ OUT □ R COS <br />□ OUT o R □ COS <br />□ OUT d R □ COS <br />□ OUT oR □ COS <br />□ OUT □ R □ COS <br />■ OUT □ R o COS <br />n R COS