Laserfiche WebLink
STI SP001 Monthly Inspection Checklist <br />Inspection Guidance: <br />> <br />> <br />> <br />ITEM STATUS COMMENTS / DATE CORRECTED <br />Tank and Piping <br />1 <br />□ Yes □ NoIs the tank liquid level gauge legible and in good working condition?2 <br />3 <br />Page 1 of 3Monthly Checklist <br />50 | P a q e <br />Is the area around the tank (concrete surfaces, ground, containment, etc.) free of visible <br />signs of leakage? <br />Is tank exterior (roof, shell, heads, bottom, connections, fittings, valves, etc.) free of visible <br />leaks? <br />Note: If "No", identify tank and describe leak and actions taken. <br />^N/A <br />^Yes □ No <br />Retain untiMate: <br />SODtWnWnnPp <br />Inspectoris Signature ___________________________________________ ____ <br />Tank(s) inspected ID 25?*^)• KAC)\ C^C -JgBg- cso cm <br />Regulatory facility name and ID number (if applicable) (, (ruttwnn lon-Ofs \m. <br />Prior Inspection Date: ■up cteT <br />^Yes □ No <br />General Inspection Information: <br />Inspection Date: <br />Inspector Name (print): KAlfi/P <br />Locally developed checklists are acceptable as long as they are substantially equivalent (as applicable). Inspections of multiple tanks may be captured on one form as <br />long as the tanks are substantially the same. <br />For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures. <br />The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a Certified <br />Inspector. It shall be performed by an owner's inspector per paragraph 4.1.2 of the standard. <br />Upon discovery of water in the primary tank, secondary containment area, interstice, or spill container, remove promptly or take other corrective action. Inspect the liquid <br />for regulated products or other contaminants and dispose of properly. <br />Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified Inspector, or a tank <br />manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section. <br />Retain the completed checklists for at least 36 months. <br />After severe weather (snow, ice, wind storms) or maintenance (such as coating) that could affect the operation of critical components (normal and <br />emergency vents, valves), an inspection of these components Is required as soon as the equipment is safely accessible after the event