My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2800 - Aboveground Petroleum Storage Program
>
PR0527228
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2025 4:37:48 PM
Creation date
7/30/2024 2:28:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0527228
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN Environmental Health Department <br /> Corrective Action Statement <br /> RE: May 23, 2024, inspection report <br /> For each violation listed below, indicate if the violation has been corrected or will be corrected by a certain date. Also, <br /> describe what was done to correct the violation in the space provided below each violation. Submit this completed form <br /> with the Return to Compliance Certification within 30 days of inspection. If you have any questions,please contact <br /> Kristina Saetern at(209)616-3045 or ksaetern@sjgov.org. <br /> CALIFORNIA TANK LINES INC, 3105 S EL DORADO ST,CERS ID: 10181301, PR0527228 <br /> Violation#59-4010056-SPCC adequately describes overfill prevention methods,and devices/systems used <br /> for each container. <br /> 0 This violation was corrected 12 This violation will be corrected by(date): August 31, 2024 <br /> 0 Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> The SPCC plan for California Tank Lines is Ding updated and will include prevention <br /> methods and system used <br /> Violation#66-4030029-Pipe supports designed to minimize abrasion and corrosion,and allow for <br /> expansion and contraction. <br /> Q This violation was corrected 0 This violation will be corrected by(date): <br /> ® Supporting documents included <br /> Describe actions taken or will be taken to correct violation: Blue Print and pictures attached <br /> Violation#69-4030026-Aboveground valves,piping,and appurtenances are regularly inspected. <br /> Q This violation was corrected 0 This violation will be corrected by(date): <br /> M Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Facility inspection check list is attached and facility employees will continue to <br /> regularly inspect all Piping and Valves. <br /> Page 6 of 7 <br /> Rev.TW2020 <br /> T Z09 4513-3420 Q F 20946"138 b w -%Qov aeg>EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.