My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
345
>
2300 - Underground Storage Tank Program
>
PR0540987
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 3:11:44 PM
Creation date
7/30/2024 2:51:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0540987
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0023459
FACILITY_NAME
Flying J Travel Center Lathrop - 1017
STREET_NUMBER
345
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
French Camp
Zip
95231
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
345 Roth RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T-1 87 T-2 91 <br /> Are both vent and tank riser piping © Yes © Yes n Yes 0 Yes <br /> secondarily contained? 0 No 0 No 0 No [71 No <br /> OPE Model <br /> What is the OPE response when © Shut off © Shut off 0 Shut off [ Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) 0 Restricts ©Restricts © Restricts 0 Restricts <br /> Flow Flow Flow Flow <br /> © Audible © Audible 0 Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> 0 Visual © Visual 0 Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping © Yes* 0 Yes* 0 Yes* 0 Yes* <br /> that may interfere with the OPE operation? 0✓ No © No 0 No 0 No <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank 104 1/2" 105 5/8" <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 94% 94.2% <br /> Is the OPE in proper operating condition to © Yes 0 Yes* 0 Yes* Yes* <br /> respond when the stored substance © No © No 0 No No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results 0✓ Pass 2 Pass © Pass El Pass <br /> © Fail © Fail 0 Fail 0 Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.