My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 10:03:04 AM
Creation date
8/8/2024 9:55:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WACTON <br /> ENGINEERING, INC. � <br /> Xjaxl-6-5 ItR Tcl' <br /> Date: <br /> Owner: <br /> Facility: <br /> OPW Overfill Model Number: <br /> Part 1 -Proper Height Setting Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: A Gattons 113a <br /> Max shut off requirement for flapper is 95% B 95% <br /> Multiply Max tank volume by 95% C Gallons 096'0 <br /> Use tank chart or ATG to determine height of n Inches v Soy 4 <br /> calculated volume <br /> Measure top of fill riser threads,or face seal E Inches <br /> adapter <br /> Tank diameter(From Tank Chart) F Inches <br /> Upper Tube in Tank(G)F-D=G G Inches <br /> Subtract 2"from upper tube in tank G-2"=K K Inches `�Y5/ <br /> Calculated minimum upper tube length(1) I Inches <br /> K+E=I <br /> Actual measured upper tube length(Without J Inches <br /> fill adapter) <br /> Part 2-Device Certification Criteria Evaluation <br /> Does the overfill prevention device meet the 95% <br /> requirement? <br /> Is the actual measured upper tube length 6.5 inches or <br /> more than the fill riser?(J must be 6.5"or more than E) <br /> Does the overfill prevention device function as required70f — <br /> Device <br /> (Inspect the device for damage,contamination,freedommovement,weakenin due to wear and corrosion)Certification PASS/FAIL <br /> Technician certifies that the device is operationally compliant. <br /> Signature of Technician: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.