water to run off the high areas. <br />• Dust Control: We will have a water tank truck on site available to spray water over the dirt <br />during our moving process to, mitigate, dust,if-needed. <br />• Timing: As per our order, this work shall commence within 30 days of the acceptance of this <br />proposal, and will attempt to be completed within 90 days, subject only to unforeseen <br />environmental circumstances beyond our control that force a timeline change. <br />• Labor: This work will be done by our own employees who have been trained to use the <br />equipment to be used for this project. The site workers need to be trained on this plan so that if <br />waste is encountered they will know how to respond <br />• Safety: Our crew will be instructed to use dust masks at all times while working on the <br />property, and all work will be done during regular working hours in compliance with local, state, <br />and federal laws. The work will have continual oversight by a foreman, and occasional oversight <br />by an upper level manager. The foreman has been trained do deal with hazardous materials on <br />the job site. The training required for un -known hazards is 40 hour "Haz-WOPER" training If the <br />waste is not disturbed no specialized training will -be r,eaui.red. <br />• Other terms: On site work will not be done without ED oversight. <br />• Follow -Up: Once this work is done, we will monitor the site in order to maintain the proper <br />grading of the land and the subsequent drainage control. <br />Deleted: re -mediate <br />{Deleted: dust <br />