My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1412
>
1900 - Hazardous Materials Program
>
PR0519428
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 9:48:30 AM
Creation date
8/20/2024 9:43:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0519428
PE
1921
FACILITY_ID
FA0001479
FACILITY_NAME
SUMIDEN WIRE PRODUCTS CORPORATION
STREET_NUMBER
1412
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
117-360-40
CURRENT_STATUS
01
SITE_LOCATION
1412 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of hazardous materials violations that have not been <br />addressed for SUMIDEN WIRE PRODUCTS CORPORATION as of July 11, 2024. <br />Open violations from July 19, 2023 inspection <br />Violation #11 - Failed to provide or document initial and/or refresher training to appropriate personnel. <br />OBSERVATION: Training records for items A and C below were not available during the inspection. <br />A) Immediate notification contacts to the appropriate local emergency response personnel and to the unified <br />program agency. <br />(C) Evacuation plans and procedures, including immediate notice, for the business site. <br />REGULATION GUIDANCE: The business plan shall include provisions for ensuring that appropriate personnel <br />receive initial and annual refresher training. All employees shall be trained in safety procedures in the event of a <br />release or threatened release of a hazardous material, including, but not limited to, familiarity with the following <br />plans and procedures: <br />(A) Immediate notification contacts to the appropriate local emergency response personnel and to the unified <br />program agency. <br />(B) Procedures for the mitigation of a release or threatened release to minimize any potential harm or damage to <br />persons, property, or the environment. <br />(C) Evacuation plans and procedures, including immediate notice, for the business site. <br />This training shall be documented electronically or by hard copy and shall be made available for a minimum of three <br />years. <br />CORRECTIVE ACTION: Immediately provide employee training for appropriate personnel and submit a copy of the <br />training records to the EHD. <br /> <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />Violation #12 - Failed to have the HMBP readily available to facility or EHD personnel. <br />OBSERVATION: Facility could not provide the Emergency Response Plan and the inventory information upon <br />request and employees do not have access to the Emergency Response Plan and the inventory information on-site. <br />REGULATION GUIDANCE: The emergency response plans and procedures, the inventory of information required <br />by this article, and the site map required by this section shall be readily available to personnel of the business or the <br />unified program facility with responsibilities for emergency response or training pursuant to this section. <br />CORRECTIVE ACTION: Immediately make arrangements to have the business plan readily available for review. <br /> <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.