My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 10:58:08 AM
Creation date
8/26/2024 10:37:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231065
PE
2361 - UST FACILITY
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
655 W CLAY ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br /> Tank ID 1-Diesel 2-Gas <br /> Tank Manufacturer O C Tank O C Tank <br /> Tank Capacity 19,951 5,929 <br /> Test Start Time 10:40 10:50 <br /> Initial Reading -10" Hg. -10" Hg. <br /> Test End Time 11:40 11:50 <br /> Final Reading -10" Hg. -10" Hg. <br /> Change in Reading 0" Hg. 0" Hg. <br /> Pass/Fail Criteria No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-Diesel 2-Diesel-BFR 3-Gas <br /> Pipe Manufacturer Smith FRP Smith FRP Smith FRP <br /> Test Start Time 10:35 10:37 10:42 <br /> Initial Reading 5 Psi 5 Psi 5 Psi <br /> Test End Time 11:35 11:37 11:42 <br /> Final Reading 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.