My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
12550
>
2800 - Aboveground Petroleum Storage Program
>
PR0537957
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 3:26:08 PM
Creation date
9/6/2024 3:24:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0537957
PE
2832
FACILITY_ID
FA0021911
FACILITY_NAME
HEARTLAND EXPRESS INC
STREET_NUMBER
12550
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
12550 S Harlan Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />CP22 - AST Non-Qualified Inspection Report <br />Date: <br />August 30, 2024 <br /> Facility Address: <br /> 12550 S Harlan RD, Lathrop <br /> Facility Name: <br /> HEARTLAND EXPRESS INC <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br />Code of Fed Regulations 112.5(b) 4010009 - 5 year review performed on SPCC and documented. <br />OBSERVATION: The facility failed to document the 5-year review of the SPCC plan. According to Nick Stamm, the <br />Spill Prevention, Control, and Countermeasure (SPCC) Plan was reviewed/changed during November 2020 after a <br />change of ownership/management of the facility. <br />REGULATION GUIDANCE: (b) Notwithstanding compliance with paragraph [112.5] (a) of this section, complete a <br />review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to <br />this part; or, if your facility was in operation on or before August 16, 2002, five years from the date your last review was <br />required under this part. As a result of this review and evaluation, you must amend your SPCC Plan within six months <br />of the review to include more effective prevention and control technology if the technology has been field -proven at the <br />time of the review and will significantly reduce the likelihood of a discharge as described in § 112.1(b) from the facility. <br />You must implement any amendment as soon as possible , but not later than six months following preparation of any <br />amendment. You must document your completion of the review and evaluation , and must sign a statement as to <br />whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. The <br />following words will suffice, “I have completed review and evaluation of the SPCC Plan for (name of facility) on (date), <br />and will (will not) amend the Plan as a result.” <br />CORRECTIVE ACTION: Immediately document the 5-year review of the SPCC Plan. Submit proof of correction to the <br />EHD. <br />This is (Class 2) Violation. <br /> 10 <br />Code of Fed Regulations 112.7 4010012 - SPCC in writing, follows code seq/cross ref, good eng practice, mgt <br />approval, items not in place. <br />OBSERVATION: The Spill Prevention, Control, and Countermeasure (SPCC) Plan reviewed at the time of inspection, <br />dated 8/30/24, did not follow the order or requirements of 40 CFR Part 112.7. The plan doesn’t follow the required <br />SPCC rule sequence and doesn’t include adequate cross-reference. One example of this: <br />-112.8(c) references section 2.2.1, however parts of 112.8(c)(1-11) are found in multiple sections throughout the plan, <br />cited under the titles of the sections and subsections, which is not accurately reflected in the cross reference (e.g. <br />112.8(c)(10) found in section 5.3) <br />Multiple other examples were found during the inspection. <br />REGULATION GUIDANCE: If you are the owner or operator of a facility subject to this part you must prepare a Plan in <br />accordance with good engineering practices. The Plan must have the full approval of management at a level of <br />authority to commit the necessary resources to fully implement the Plan. <br />CORRECTIVE ACTION: Ensure that your SPCC Plan complies with the following requirements: <br />1. It follows the required SPCC rule sequence and/or includes adequate cross-reference. <br />Provide proof of correction to the EHD. <br />This is (Minor) Violation. <br /> 11 <br />Code of Fed Regulations 112.7(a)(3), 25270.4.5(a) 4010015 - SPCC contains an adequate facility diagram. <br />OBSERVATION: The Spill Prevention, Control, and Countermeasure (SPCC) Plan failed to include an adequate facility <br />diagram. <br />-Failed to include the location and contents of EACH fixed oil storage container AND storage area of portable <br /> 16 <br />FA0021911 PR0537957 SC001 08/30/2024 <br />EHD Rev. 12/06/2021 CP22 - AST Non-Qualified OIRPage 6 of 9 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD
The URL can be used to link to this page
Your browser does not support the video tag.