My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:40:17 AM
Creation date
9/17/2024 3:49:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0542116
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
6009 N EL DORADO ST STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) 87 91 DIESEL <br />Are both vent and tank riser piping ❑✓ Yes ❑✓ Yes p Yes ❑ Yes <br />secondarily contained? ❑ No ❑ No ❑ No ❑ No <br />OPE Model 71SO 71SO 71SO <br />What is the OPE response when activated? ❑✓ Shut off ❑✓ Shut off D Shut off ❑Shut off <br />(Check all that apply.) Flow Flow Flow Flow <br />❑Restricts ❑Restricts ❑Restricts ❑Restricts <br />Flow Flow Flow Flow <br />❑ Audible ❑ Audible ❑ Audible ❑ Audible <br />Alarm Alarm Alarm Alarm <br />❑ Visual ❑ Visual ❑ Visual ❑ Visual <br />Alarm Alarm Alarm Alarm <br />Are flow restrictors installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br />that may interfere with the OPE operation? ✓❑ No ❑✓ No ❑✓ No ❑ No <br />At what level in the tank is the OPE set to 101 105 105 <br />activate? Inches from bottom of tank <br />What is the percent capacity of the tank at 91.2 94.4 93.7 <br />which the OPE activates? <br />Is the OPE in proper operating condition to ❑✓ Yes ❑✓ Yes ❑✓ Yes ❑ Yes <br />respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />OPE Inspection Results ❑✓ Pass ❑✓ Pass ZPass ❑ Pass <br />ElFail ❑ Fail ❑ Fail ❑ Fail <br />8. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page maybe attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup reports) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.