My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
1900 - Hazardous Materials Program
>
PR0520139
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:10:16 AM
Creation date
10/8/2024 9:09:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0520139
PE
1921
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Radiation: <br />Hazardous Materials & Waste Contingency Plan <br />Kaiser Permanente Stockton Medical Offices <br />1/01/2024-12/31/2024 <br />Spill / Release: <br />Proeedures will outline responsibilities to be assumed by those in the Medical facility and <br />wtll specifically address the role of external agencies contracted to address emergency spills <br />• Spills must be cleaned up immediately by a properly trained person using appropriate <br />personal protective equipment in relation to the spill. <br />eP,!!\ye cleaned accor<ling to Hazardous Waste Management Policy EC.HZ.056: <br />Spill Management: Hazardous Materials & Waste. <br />• In the event of an employee exposure, the employee shall immediately be evaluated at <br />the Employee Health Services or an Emergency Department. <br />When a small spill is identified the following process will be followed: <br />Staff that discovers the spill will follow S.I.N.: <br />Safety First! Clear the area ot all non-essential personal. <br />I = Isolate the area by closing doors / windows. <br />= Notify your Manager / Supervisor and alert the departmental spill response team for clean- <br />s hall be handled according to all policy and procedures for hazardous material. <br />The emergency coordinator shall ensure that in the affected area(s) of the facility: <br />• No waste that may be incompatible with the release material is transferred, treated, <br />stored, or disposed of until cleanup procedures are completed; and all emergency <br />equipment is cleaned and fit for its intended use before operation are resumed. <br />The administrator (or designee) shall notify the Department of Health Services, and <br />appropriate State and local authorities, which facility is in compliance with the above noted <br />section before operations are resumed in the affected area(s) of the facility. <br />The administrator (or designee) shall document the time, date and details of any incident that <br />requires implementing the contingency plan. Within 15 days after the incident the <br />w mi"lstrator (or shall submit a written report on the incident to the Department of <br />Health Services. The report shall include: <br />• Name, address, and telephone number of the administrator (or designee) <br />• Name, address, and telephone number of the facility <br />• Date, time, and type of incident (e.g., fire, explosion) <br />• Name and quantity of material(s) involved <br />• The extent of injuries if any <br />An assessment of actual or potential hazards to human health or the environment, where this <br />is applicable and, Estimated quantity and disposition of recovered material that resulted from <br />the incident.
The URL can be used to link to this page
Your browser does not support the video tag.