Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> H. EARTHQUAKE VULNERABILITY <br /> Identify areas of the facility that are vulnerable to hazardous materials releases due to seismic motion.These areas require immediate isolation and inspection. <br /> VULNERABLE AREAS(Check all that apply): LOCATIONS(e.g.,Shop,outdoor shed,lab): Jsz <br /> ❑x 1.HAZARDOUS MATERIALS AND/OR WASTE STORAGE AREAS 1 <br /> x❑ 2 PROCESS LINES AND PIPING 3_LABORATORY Maintenance Shop, Main Process area, D <br /> ❑ 4.WASTE TREATMENT AREA <br /> Identify mechanical systems vulnerable to releases/spills due to earthquake-related motion.These systems require immediate isolation and inspection. <br /> VULNERABLE SYSTEMS AND/OR EQUIPMENT(Check all that apply): 113- LOCATIONS: H4. <br /> ❑ 1.SHELVES,CABINETS AND/OR RACKS <br /> ❑x 2.TANKS AND SHUT-OFF VALVES <br /> ❑x 3 PORTABLE GAS CYLINDERS Tank Farm, Main Process, DD&E, Mainten <br /> ❑x 4.EMERGENCY SHUT-OFF AND/OR UTILITY VALVES <br /> 5.SPRINKLER SYSTEMS <br /> ❑x 6.STATIONARY PRESSURIZED CONTAINERS(e.g.,Propane tank) <br /> I. EMPLOYEE TRAINING <br /> Employee training is required for all employees and/or contractors handling hazardous materials and/or hazardous wastes during normal and/or emergency operations. <br /> Most facilities will need to submit a separate Training Plan.However,your CUPA may accept this section as the Training Plan for some small facilities. <br /> Employee training plans may include the following content: <br /> • Applicable laws and regulations; 0 Communication and alarm systems; <br /> • Emergency response plans and procedures; • Personal protective equipment; <br /> • Safety Data Sheets; 0 Use and maintenance of emergency response equipment and supplies <br /> • Hazard communication related to health and safety; (e.g.Fire extinguishers,respirators,spill control materials); <br /> • Methods for safe handling of hazardous substances; 0 Decontamination procedures; <br /> • Hazards of materials and processes(e.g.,fire,explosion,asphyxiation); • Evacuation procedures and evacuation staging locations; <br /> • Hazard mitigation,prevention and abatement procedures; a Identification of facility areas,equipment,and systems vulnerable to <br /> • Coordination of emergency response actions; earthquakes and other natural disasters. <br /> • Notification procedures for local emergency responders,CUPA, • OTHER eci S <br /> Cal 08S,and onsite personnel; ( p fy) <br /> Check the applicable boxes below to indicate how the employee training program is administered. <br /> ❑x 1. FORMAL CLASSROOM ❑x 2. VIDEOS [913. SAFETY MEETINGS ❑4. STUDY GUIDES/MANUALS I' <br /> ❑x 5. OTHER(Specify): Online Courses 12. <br /> ❑6. NOT APPLICABLE SINCE FACILTTY I IA5 NO EMPLOYEE5 <br /> ❑x 7. CHECK IF A SEPARATE EMPLOYEE TRAINING PLAN IS USED AND UPLOADED TO CERS AS A PDF DOCUMENT B. <br /> 0 8. CHECK IF EMPLOYEE TRAINING IS COVERED BY THE ABOVE REFERENCED CONTENT AND OTHER DOCUMENTS ONSITE " <br /> EMPLOYEE TRAINING FREQUENCY AND RECORDKEEPING TRAINING MUST BE: <br /> • Provided initially for new employees as soon as possible following the date of hire. New employees should not work in an unsupervised position that involves <br /> hazardous materials handling and/or hazardous waste management without proper training; <br /> • Provided within six months from the date of hire for new employees at a large quantity generator; <br /> • Ongoing and provided at least annually; <br /> • Amended prior to a change in process or work assignment; <br /> • Given upon modification to the Emergency Response/Contingency Plan. <br /> Large Quantity Generator Training:Large quantity generators(1,000 kg or more)must retain written plan and documentation of employee training which includes: <br /> ■A written description of the type and amount of both initial and ongoing training that will be given to persons filling eachjob position having responsibility for hazardous <br /> waste management and/or emergency response. <br /> • The name,jab title and job description for each position atthe facility related to hazardous waste management. <br /> • Current employee training records must be retained until closure of the facility and former employee training records must be retained for at least three years after <br /> termination of employment. <br /> Small Quantity Generator Training: Small quantity generators (less than 1,000 kg)must include basic hazardous waste management and emergency response <br /> procedures but a written employee training plan and training records are not required, In order to show that the facility has met the small quantity generator employee <br /> training requirement,an employee training plan and training records may be made available. <br /> Hazardous Materials Business Plan Training:Businesses must provide initial and annual employee training that includes the content referenced above. The training <br /> may be based on the job position and training records must be made available for a period of at least three years. <br /> J. LIST OF ATTACHMENTS <br /> Check one of the following: J� <br /> ❑ 1. NO ATTACHMENTS ARE REQUIRED;or <br /> (�2. THE FOLLOWING DOCUMENTS ARE ATTACHED: J2. <br /> Rev.11/30/22 Page 4 of 4 <br />