Laserfiche WebLink
1FUEL GC TO WORK WITH STORE GC ONSCHEDULING. ANY CONFLICTS SHALL BEBROUGHT TO THE ATTENTION OF THE SEIPROJECT MANAGER.2 FUEL GC RESPONSIBLE FOR ALL CONCRETE OVER TANKS AND PRODUCT PIPING (I.E. TANK SLAB AND DRIVE MATS). CONCRETE CHAIRS ARE BY SEI.3FUEL GC RESPONSIBLE FOR CANOPY FOOTINGS.4FUEL GC TO INSTALL CANOPY DRAINS (WHEREAPPLICABLE) TO POINT OF CONNECTION WITHIN(10) FT OF DRIVE MATS.5FUEL EC TO INSTALL ALL FUEL RELATEDELECTRONICS (I.E. DATA BOXES, EDH UNIT,TURBINE RELAYS, ISOLATION RELAYS, ETC).6FUEL GC RESPONSIBLE FOR ALL ELECTRICALCONDUITS, SEAL-OFFS, ELECTRICAL J-BOXES PERSTATE, LOCAL, MANUFACTURERS AND SEI CODESAND SPECIFICATIONS.7FUEL EC TO PULL WIRE FOR CANOPY LIGHTING,INTERCOM, DISPENSERS, TURBINES ANDMONITORING SYSTEM DEVICES.8FUEL EC TO MAKE ALL FINAL CONNECTIONS TOFUELING EQUIPMENT AND ELECTRONICS.9FUEL GC TO PULL TRADE PERMITS FOR FUELINGWORK (AS REQUIRED).10FUEL GC TO "CALL FOR" AND "BE PRESENT FOR"ALL LOCAL REGULATOR INSPECTIONS ANDRESPONSIBLE FOR SCHEDULING ON-SITEINSPECTIONS WITH APPROPRIATE SEIREPRESENTATIVE RELATED TO FUELING.11FUEL GC TO COORDINATE WITH TANKNOLOGYAND THE SEI CONSTRUCTION MANAGER FORTESTING OF FUELING SYSTEM.12FUEL GC TO HAVE PERSONNEL ON SITE FORTESTING.13FUEL GC RESPONSIBLE FOR CLOSE OUT PACKAGEPER 7-11 MATRIX.1STORE GC TO WORK WITH FUEL GC ONSCHEDULING. ANY CONFLICTS SHALL BEBROUGHT TO THE ATTENTION OF THE SEIPROJECT MANAGER.2STORE ELECTRICAL CONTRACTOR TO RUNUNDERGROUND ELECTRICAL CONDUITS TO (10) FTOUTSIDE OF BUILDING SLAB (COORDINATELOCATION, QUANTITY, SIZE AND TYPE OF CONDUITWITH FUEL CONTRACTOR).3STORE ELECTRICAL CONTRACTOR TO INSTALLSEAL-OFFS (AS REQUIRED), ELECTRICALRACEWAYS, GUTTER BOXES, FUEL ELECTRICALPANELS, CIRCUIT BREAKERS AND FEEDERS.4STORE ELECTRICAL CONTRACTOR TO INSTALLOVERHEAD CONDUIT FOR VEEDER ROOT FROMELECTRICAL ROOM TO LOCATION OF V/R ONPLANS.5STORE GC RESPONSIBLE FOR ALL EXTERIORAREA LIGHTING, IRRIGATION AND AIR/VACUUMUNIT SLAB AND POWER.6 MONUMENT POLE SIGN TO BE PROVIDED ANDINSTALLED BY SIGNAGE CONTRACTOR. THE SIGNIS TO BE FUTURE MEDIA ELECTRONIC PRICE SIGN.STORE GENERAL CONTRACTORFUEL CONTRACTOR17-ELEVEN CONVENIENCE STORE2FUELING CANOPY AND DISPENSERS3UNDERGROUND FUEL STORAGE TANKS AND SLAB4FUEL STORAGE TANK VENTS5AIR-VAC MACHINE6(2) EMERGENCY SHUT OFF SWITCHES,REF 2-G10.07VAPOR POLISHER8VEEDER ROOT SITE MONITOR CONSOLE(FIELD VERIFY)9OVERFILL ALARM. REF 4-G6.010MONUMENT & PYLON SIGNSA.B.C.D.E.F.G.H.I.J.K.L.M.N.TANK BURIAL CHART - STORE (41256)COMPONENTFINISH GRADE ELEV. AT BEGINNING OF RUN (FT):PIPE BURY (FT):ELEVATION OF PIPE AT BEGINNING OF RUN (A-B)PIPE LENGTH (LONGEST RUN) (FT):PIPING RUN FALL (FT) (D*1/8" PER FT):TOTAL CROSSOVERS/SWING JOINTS:CROSSOVER/SWING JOINT DEPTH (FT):ELEVATION AT END OF PIPE (FT) (C-E-G):ADD FOR EXTRACTOR TEE AT SUMP:TOP TANK ELEVATION (FT) (H-I):HIGHEST FINISH GRADE ELEVATION AT TANK SLAB (FT):MAX BURY DEPTH (K-J) (FT): MAX = 5.67'LOWEST FINISH GRADE ELEVATION AT TANKS (FT):MIN BURY DEPTH (M-J) (FT): MIN = 4.17'TANK BURIAL DEPTH IS GOVERNED BY VENT PIPING.THE TOP OF TANKS SHALL BE SET AT - 15.61'. REGULARVAPOR21.211.5019.711631.7011.0017.011.0016.0121.485.4720.744.73VENT20.852.0018.851671.7400.0017.111.5015.6121.485.8720.885.2721.211.5019.711431.4911.0017.221.0016.2221.485.2620.884.66CLEAN-AIR/VANPOOL/EV EV PARKING STALL EV PARKING STALL NOPARKINGCLEAN-AIR/VANPOOL/EVCLEAN-AIR/VANPOOL/EV5118688681810'-0"UNDERGROUND TRENCHING6A100'-0"100'-0"FFF20.7421.4521.3821.0320.9421.2521.2021.4835101092TC 21.71BC 21.21TC 21.89BC 21.39TC 22.06BC 21.56TC 22.02BC 21.52TC 21.87BC 21.37TC 21.71BC 21.21E. ALPINE AVE.WEST LAKET6A20.8547G0.1FUELING ARCHITECTURAL SITE PLAN <br />KRA <br />TLH <br />Job#:A20-200 <br />Scale: <br />Date: <br />Drawn By: <br />Checked By: <br />Rev. #Date Description <br />07/15/20 <br />AS NOTEDSHEET:7-ELEVEN #41256 <br />3230 WEST LANE <br />STOCKTON, CA 95204 <br />7-ELEVEN, INC. <br />3200 HACKBERRY ROAD, IRVING TEXAS 75063 <br />Proto 2022-04ARCHITECTURE CIVIL ENGINEERING MEP ENGINEERING <br />10755 SANDHILL ROAD, DALLAS, TEXAS 75238 <br />TEL: 214-343-9400 www.dimensiongrp.com <br />Documents prepared by The <br />Dimension Group are to be used <br />only for the specific project and <br />specific use for which they are <br />intended. Any extension of use to <br />other projects, by owner or any <br />other party, without the expressed, <br />written consent of The Dimension <br />Group is done at the user's own <br />risk. If used in a way other than <br />that specifically intended, user will <br />hold The Dimension Group <br />harmless from all claims and losses.01/10/2308/03/20 <br />CITY COMMENTS09/30/20 <br />PEER REVIEW COMMENTS <br />CITY COMMENTS01/13/21 <br />OWNER CHANGES11/22/22 <br />CAFUELING - USASTORE CONTRACTOR RESPONSIBLE FOR ROUTING (34)3/4" AND (1) 1" ROBROY PVC COATED GALVANIZED STEELCONDUITS (WITH PULL STRING) FROM ELECTRICAL ROOMTO (10') PAST BUILDING SLAB. FUELING CONTRACTOR TOPICK UP CONDUITS AT THIS LOCATION AND ROUTE TOFINAL TERMINATION. FUELING CONTRACTORRESPONSIBLE FOR PULLING WIRE AND MAKING FINALTERMINATIONS. REF G16.0 FOR SPECIFICATIONS.NNOTE:ANY WORK PREFORMED IN THE CITY RIGHT OF WAY WILL REQUIREOBTAINING A SEPERATE CITY ENCROACHMENT PERMIT.2PANEL LPANEL MDPPANEL F2NOTE:FIRE HYDRANT REQUIREMENT PER PERMIT #BP20-03136.333444445555501/10/23 CITY COMMENTS