PANEL P 125 AMP FRAME MAIN LUG ONLY
<br /> FUELING SYSTEM 120/24OV, 1 PHASE, 3 WIRE BRANCH C5'5± 5OLT-ON, SIZE AS INDICATED e 0-)TRACY TRIANGLE 30 CIRCUIT,SURFACE MTD.NEMA 1 INTERRUPTING RATING: 42,000 AIC Z
<br /> Ln
<br /> DESIGNATION CKT.BRIM VOLT-AMPS CKT.BRGR. DESIGNATION
<br /> CKT. PANEL WIRE SERVES SERVES WIC PANEL CKT.
<br /> NO. SPACE AMP POLE AWG LOAD A B LOAD AUKS AMP POLE SPACE NO. jy N U (7V
<br /> li I
<br /> 1 1 20 2 012 DISPENSER 1/2 500 1900 1400 SU5MERGED TUR5INE PUMP (STP) #10 30 2 2 2 LML uj
<br /> W O r
<br /> 3 3 (SWITCHED NEUTRAL) 0 1400 1400 2 hp REG (87) 4 4 LML Z 6l
<br /> 5 5 20 2 #12 DISPENSER 3/4 500 1900 1400 SUBMERGED TUR5INE PUMP (STP) 010 30 2 6 6 Z O W r cv
<br /> - - - - - - N 00121 W=5 - - - - - - - -1 (SWITCHED NEUTRAL) 0 1400 1400 2 hp SUPER (gU 8 8 0 (a - m~
<br /> 13 13 20 2 012 DISPENSER 5/6 500 1100 1200 SUBMERGED TUR5INE PUMP (STP) #10 30 2 10 10 J O
<br /> 11 11 (SWITCHED NEUTRAL) 0 1200 1200 1.5 hp DIESEL 12 12
<br /> 13 13 20 2 #12 DISPENSER 1/8 500 1100 1200 SUBMERGED TUR5INE PUMP (STP) 1012 20 1 14 14 6
<br /> 15 15 (SWITCHED NEUTRAL) 0 1200 1200 1.5 hp E85 Igo 16
<br /> L I 11 1-t 20 2 012 SPARE 0 0 0 SPACE IS IS w
<br /> 19 19 SPARE 0 500 500 ESO 012 20 1 20 20 CL �3
<br /> 21 21 20 2 012 SPARE 0 0 0 SPACE 22 22
<br /> 23 23 SPARE 0 1500 1500 INTERCOM 012 20 1 24 24
<br /> CL 25 25 20 1 012 MONITOR 1,000 1500 500 OVERFILL ALARM 012 20 1 26 26 CL
<br /> 21 21 SPARE 0 0 0 SPACE 28 28
<br /> PROPOSED BUOII-100HO OD 3 CL 2c3 2S 20 1 012 ELLDs 500 500 0 SPACE 30 30
<br /> NEW
<br /> asR 6348t SF. C-STORE TOTAL CONNECTED LOAD 9,200 1,200 Z w Q
<br /> I 1 2 I wmy � �4
<br /> BUS A: 9,200 VA CONTINUOUS LARGEST CONNECTED TOTAL N.E.G. W > O W N
<br /> BUS 5: -1,200 VA LOAD: (CL) MOTOR LOAD: (LML) LOAD: COMPUTED LOAD: W Lu (� > I v
<br /> TOTAL: 16,400 VA ( 2,500 VA x 0.25) + C 2000 VA x 0.25) + 16,400 VA = 16,400 VA J O m p
<br /> Dim U
<br /> AMPERES 120/240V, I PHASE = -14 AMPS � z �
<br /> 4) � _ c � U
<br /> ----------------------------- wqtm P-20 I. P w
<br /> PROVIDE PLASTIC PHENOLIC NAMEPLATE AND TYPED PANEL CIRCUIT DIRECTORY. � � � I � _
<br /> 2. PROVIDE ISOLATED GROUND BUSS FOR ISOLATED GROUND CIRCUIT BREAKER. Q U
<br /> 3. PROVIDE SEAL-OFF FITTINGS FOR ALL CIRCUITS ENTERING PANEL FROM GLASS I, DIV. 2 AREAS. Q -q - Q
<br /> (E)FREEWAY SIGN
<br /> FUEL SYSTEM ELECTRICAL KEYNOTES 0 w
<br /> I. INSTALL NEW FUEL SYSTEM CONTROLS. SUPPLY AND INSTALL NEW FUEL SYSTEM RELATED PANELS, WIREWAYS, CONDUIT, CONDUCTORS, SEALOFFS, ETC., AS Z
<br /> ---------------------- w
<br /> m w REQUIRED, PER MNFR. RECOMMENDATIONS. REFER TO AND COORDINATE W/ THE REQUIREMENTS OF THE ARCHITECTURAL AND ELECTRICAL SHEETS. IF U
<br /> CONFLICTS OCCUR BETWEEN THESE AND OTHER DRAWINGS NOTIFY THE ARCHITECT / ENGINEER.
<br /> z C
<br /> F------------- ----
<br /> - I m
<br /> -------------------
<br /> ---- --
<br /> O1 2. NEW (N) MONITORING PANEL. INSTALL NEW MONITORING COMPONENTS PER MNFR. RECOMMENDATIONS.P-20 912 -----Q P-20
<br /> o o ��-� 4 0 0 �,-p o 0 4 �o o 3. (N) EMERGENCY SHUTOFF (E.S.O.) W/ 3/4" C.. SEE ALSO FUEL SYSTEM SITE PLAN. INSTALL SIGNS(S) PER CFC 2303.2. MUSHROOM PUSH-BUTTON W/
<br /> PLEXIGLAS COVER (OR NEMA 3R ENCL.). CONNECT TO MAIN SHUNT TRIP CIRCUIT, WIRE PER MNFR. REQUIREMENTS. ((3) #12 a. - MIN., SEE KEYNOTES 12, 15)
<br /> o F.E. �_. \ LF ,.. --�
<br /> 4. (N) 3/4" C. FOR STP (SUBMERGED TURBINE PUMP) W/ #10'5 AND #10 GND., (MIN.) VIA WIREWAY. (POWER (4) #10ga., ) v -
<br /> 00 00 O 00 00
<br /> 5. (N) I" C. HOMERUN TO WIREWAY FOR ELECTRONIC LINE LEAK DETECTOR, SUMP FLOAT SWITCH, VACUUM/HYDRO SENSORS, SUMP MINI-HYDRO SENSOR AND w r �4 �►
<br /> NEW FUELING q �t
<br /> ------------------- 13 1� 15 16 ---------------------------------- -----J TANK GAUGE PROBE. ((&) 2#18ga. SHE). CABLE) � cmv w 11
<br /> 6. (N) 3/4" C. HOMERUN TO WIREWAY W/ 3/4" LOOPED (NO LOOP AT DIESEL) FOR HYDROSTATIC SENSOR, SUMP FLOAT SWITCH AND SUMP MINI-HYDRO cv
<br /> ----------------------------- ----------------- -------- PT'' I SENSORS. (INTERSTITIAL (1) 2#18ga. SND, CABLE, FILL (2) 2#18ga. SND. CABLE) z
<br /> 05 P-2 O O O usra O O O O I 1. (N) 3/4" C. HOMERUN TO WIREWAY FOR DISPENSER N.V., TYP.. WIRE PER MNFR. REQUIREMENTS. (3+0's (5) #12ga., (2) #14ga. TWISTED - FOR 3+1'S ADD (1) #12 ga.) w w O
<br /> _ \ _ J
<br /> \ I S. (N) 3/4" C. HOMERUN TO WIREWAY FOR MONITORING L.V., TYP.. WIRE PER MNFR. REQUIREMENTS. (MONITOR (3) 2#18ga. SND. CABLE) u- n-
<br /> aoo bT °o ,
<br /> ` ��
<br /> 9ga 9 (N) 3/4" C. HOMERUN TO WIREWAY FOR DISPENSER INTERCOM PLUS CAT-5/ETHERNET FOR EM -READY CARD SYSTEM, T P.. WIRE PE MNF R.
<br /> REQUIREMENTS. (INTERCOM MIN. (2) #142a. TWISTED, (2) #16ga.)
<br /> I
<br /> ------ -----------------��_2� -----, - 1f� _ 10. (N) NEW 3/4" C. FROM VENT CONTAINMENT / MONITORING TO WIREWAY, W/ SEAL-OFFS AS REQUIRED. (SUMP - (2) 2#18ga. SND, CABLE,
<br /> 0 El 11
<br /> x.
<br /> P 20 ------ CCVP - (1) 2#18ga. SHE). CABLE)
<br /> IL (N) NEW 3/4" C. TO WIREWAY FOR OVERFILL ALARM. WIRE PER MNFR. REQUIREMENTS. ((4) #12ga.) W /V Z
<br /> °T 5 12. HOMERUN CIRCUIT, TYPICAL. MINIMUM (2) # D 12'S AN (1) # D 0
<br /> 12 GN . IN 3/4" C. W/ MAXIMUM (3) HOMERUN CIRCUITS PER CONDUIT. NUMBER OF ARROWHEADS J Q j
<br /> CURB.GUTTER<9IDEWALIC INDICATES NO. OF HOMERUN CIRCUITS. BRANCH CIRCUITS GREATER THAN 15 FT. TO FIRST LIGHT FIXTURE OR OUTLET SHALL BE MINIMUM #10 AWG. � V Z O ca 0 OU
<br /> INCREASE WIRE AND CONDUIT SIZE PER MNFR. AND/OR CODE REQUIREMENTS. V Z J �/ z
<br /> 13. ALL CONDUITS AT TRAFFIC AREAS TO BE BURIED A MIN. OF 24" (12" AT NON-TRAFFIC AREAS). Q W
<br /> NORTH T R A C Y B O U L E V A R D 14. LOCATE SEAL-OFF FITTINGS PER CEC 514 AND HAZARDOUS LOCATION SPECIFICATIONS, THIS SHEET, FOR CIRCUITS TO DISPENSING AREA AND LL
<br /> _ U O
<br /> UNDERGROUND FUEL TANKS, AS APPLICABLE. z
<br /> F U E L SYSTEM E L E C T R I C A L S I T E P L A N �a 15. INSTALL (CONSULT OWNER PROVIDED EQUIPMENT LIST) AND/OR PROVIDE AND INSTALL ADDITIONAL SYSTEM COMPONENTS, INCLUDING BUT NOT LIMITED
<br /> SCALE:P = 10' (USE GRAPHIC SCALE FOR REDUCED PLOTS) d TO CONDUITS, NIGH 4 LOW VOLTAGE CONDUCTORS FOR POWER, MONITORING AND COMMUNICATIONS (INTERCOM $ CONTROL), J-BOXES, SEALOFFS, ETC. AS
<br /> SITE PLAN DEVELOPED PRIMARILY FROM RECORD DRAWINGS 0 10 20 40 AND PHOTO REVIEW. THIS IS NOT A SURVEY. REQUIRED TO PROVIDE A COMPLETE, WORKABLE SYSTEM PER MNFR. AND CODE REQUIREMENTS. INSURE THAT CONDUCTORS MATCH MNFR'S. REQ'S. FOR
<br /> PURPOSE AND CONDUIT LENGTHS.
<br /> 16. CONDUIT RUNS ARE INTENDED AS SCHEMATIC, AND MAY BE EXAGGERATED FOR DRAFTING CLARITY. FIELD CONDITIONS AND STANDARD PRACTICES
<br /> MAY INDICATE DIFFERENCES AND ARE EXPECTED.
<br /> (CFC 2303.2.1) HEIGHT. THE HEIGHT OF THE EMERGENCY DISCONNECT SWITCH SHALL BE NOT LESS THAN 42 INCHES (106-1 mm) a HAZARDOUS LOCATION SPECIFICATIONS
<br /> AND NOT MORE THAN 48 INCHES (1219 mm) MEASURED VERICALLY, FROM THE FLOOR LEVEL TO THE ACTIVATING BUTTON.
<br /> U U U U
<br /> A. FUEL SYSTEM CONTRACTORS AND INSTALLERS ARE EXPECTED AND REQUIRED TO HAVE CURRENTLY REQUIRED EQUIPMENT MANUFACTURERS' z z z z
<br /> CERTIFICATIONS AND APPROVALS FOR INSTALLATION OF ALL OF THE FUEL SYSTEM RELATED EQUIPMENT AND WORK, INCLUDING ELECTRICAL -4 4 1 d
<br /> COMPONENTS, AND TO PROVIDE A COMPLETE, WORKABLE SYSTEM PER MNFR. AND CODE REQUIREMENTS. }
<br /> B. PROVIDE EXPLOSION PROOF JUNCTION BOX AND SEAL-OFF FITTINGS PER ARTICLE 514 OF THE CEC FOR HAZARDOUS LOCATIONS.
<br /> C. ALL CONDUIT AND WIRING TO FUEL DISPENSERS AND SUBMERSIBLE PUMPS SHALL BE INSTALLED AND USED IN ACCORDANCE WITH FLAMMABLE AND
<br /> COMBUSTIBLE LIQUIDS CODE NFPA 30 AND APPLICABLE PROVISIONS OF THE LATEST EDITION OF THE CALIFORNIA ELECTRIC CODE ARTICLE 514, MOTOR w
<br /> FUEL DISPENSING FACILITIES, INCLUDING THE FOLLOWING: PROVIDE EXPLOSION PROOF/SEAL-OFF FITTINGS ON ALL POWER SUPPLY LINES LOCATED AT <r m
<br /> FUEL DISPENSERS, SUBMERSIBLE PUMPS AND ANY OTHER ELECTRICAL EQUIPMENT LOCATED IN A 20' RADIUS OF THE GASOLINE FUEL DISPENSER ISLAND. \S) r
<br /> AN AREA PER FIGURE 514.3 OF THE CEC IS DEFINED AS A HAZARDOUS LOCATION WITHIN A 20' RADIUS FROM THE END OF EACH DISPENSER. ALL @ @ @ U
<br /> ELECTRICAL EQUIPMENT AND WIRING WITHIN THIS AREA SHALL BE PER CEC 514.
<br /> D. CEC 541.9 SEALING (OF DISPENSERS) - A LISTED SEAL (EXPLOSION PROOF SEAL-OFF FITTING) SHALL BE PROVIDED IN EACH CONDUIT RUN ENTERING OR
<br /> LEAVING A DISPENSER OR ANY CAVITIES OR ENCLOSURES IN DIRECT COMMUNICATIONS THEREWITH. THE SEALING FITTING OR LISTED EXPLOSIONPROOF o„
<br /> REDUCER AT THE SEAL SHALL BE THE FIRST FITTING AFTER THE CONDUIT EMERGES FROM THE EARTH OR CONCRETE. (5) AT BOUNDARY- ADDITIONAL SEALS > Q =w
<br /> SHALL BE PROVIDED IN ACCORDANCE WITH 501.15. SECTIONS 501.15(AX4) AND (5X2) SHALL APPLY TO HORIZONTAL AS WELL AS TO VERTICAL BOUNDARIES IVo
<br /> OF THE DEFINED CLASS I LOCATIONS. I Z LL-1 o u w 0
<br /> E. PROVIDE EXPLOSION PROOF/SEAL-OFF FITTINGS AT THE POINT OF CONDUIT STUBUP ENTRANCE CAT PANELBOARD) INTO THE SERVICE BUILDING FOR ALL Q i�f" � 0
<br /> POWER SUPPLY CONDUITS TO FUEL DISPENSERS, SUBMERSIBLE PUMPS AND OTHER ELECTRICAL EQUIPMENT LOCATED IN THE ABOVE DEFINED J (n 'Z ow o ®a "
<br /> HAZARDOUS LOCATIONS. a W ui O
<br /> o�Z�y: p �
<br /> F. ALL BELOW GRADE CONDUIT RUNNING THROUGH (ENTERING OR LEAVING - THEN THE ENTIRE CONDUIT RUN SHALL BE RGS) THE CLASS 1 DIVISION 1 CL a Q o
<br /> D HAZARDOUS LOCATION AS DESCRIBED ABOVE AN AS DEFINED PER CEC ARTICLE 514 SHALL BE RGS. RIGID NON-METALLIC CONDUIT (PVC) MAY ONLY w Q
<br /> BE USED AS LONG AS THE PROVISIONS OF NEC ARTICLE 514.0 EXCEPTION NO. 2 ARE STRICTLY ADHERED TO INCLUDING THE REQUIREMENTS FOR AN = J Z �w w p�
<br /> EQUIPMENT GROUNDING CONDUCTOR IN THE RIGID NON-METALLIC CONDUIT AND THE EQUIPMENT GROUNDING CONDUCTOR MUST BE BONDED TO THE W W w o 0 Q 0 z O
<br /> EXPLOSION-PROOF RACEWAY SYSTEM INSIDE THE DISPENSER (THIS MAY BE ACCOMPLISHED BY TERMINATING THE EQUIPMENT GROUNDING CONDUCTOR z a-w' U
<br /> ON THE GROUND SCREW PROVIDED IN THE JUNCTION BOX). WHERE RIGID NON-METALLIC CONDUIT IS USED IT SHALL BE BURIED A MINIMUM OF 2 FEET = J 4~ w u z
<br /> oyw(LffDO
<br /> BELOW EARTH AND THREADED RIGID METAL CONDUIT SHALL BE USED FOR THE LAST 2 FEET OF THE UNDERGROUND RUN TO EMERGENCE OR POINT OF LL W o w� w°-o
<br /> CONNECTION TO THE ABOVE GROUND RACEWAY. o IV w
<br /> 1: Q ®DW
<br /> G. EACH CIRCUIT LEADING TO OR THROUGH A DISPENSING PUMP SHALL BE PROVIDED WITH A SWITCH TO DISCONNECT SIMULTANEOUSLY FROM THE SOURCE
<br /> OF SUPPLY ALL CONDUCTORS OF THE CIRCUIT INCLUDING THE GROUNDED CONDUCTOR.
<br /> A-11
<br /> H. THE METAL PORTION OF DISPENSING PUMPS, METAL RACEWAYS AND ALL NON-CURRENT CARRYING METAL PARTS OF ELECTRIC
<br /> EQUIPMENT, REGARDLESS OF VOLTAGE SHALL BE GROUNDED AS PROVIDED IN CEC ARTICLE 250. ,y �n
<br /> PET = 6
<br /> I. CONDUCTORS SHALL BE: THWN WIRE, GAS $ OIL RESISTANT, AND BELDEN (OR EQUAL) 88160 MULTI-CONDUCTOR, SINGLE
<br /> PAIR CABLE (FOR 2#IBGA. SHE). CABLE). R N NO s ai as ~
<br /> ��F CALZ�O OF S IFETI SHEETS
<br />
|