My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3780
>
2300 - Underground Storage Tank Program
>
PR2600076
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 2:03:26 PM
Creation date
10/29/2024 8:54:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2600076
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0005924
FACILITY_NAME
H&M PETROLEUM CORP
STREET_NUMBER
3780
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3780 100 N TRACY BLVD TRACY 95304
Suite #
100
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r, VEEDER-ROOT <br /> 0 <br /> Hour(LPH) and 0.2 GPH/0.76 LPH,and a pressure decay test to meet the U.S. Environmental <br /> Protection Agency(EPA) EPA 3.0 GPH/11.4 LPH test requirements. DPLLD offers flexible testing <br /> and digital reporting options, helping to detect catastrophic leaks. When paired with a TLS- <br /> 450PLUS Automatic Tank Gauge(ATG),customers can monitor up to 1,178 gallons/4,459 liters <br /> of fuel line volume. <br /> a <br /> • f 7 <br /> System Features <br /> Equipment Design <br /> • Pressure sensor is installed easily without breaking piping or adding anew sump <br /> • Stainless steel construction meets the challenges of a highly corrosive environment <br /> • Test lines at full pressure for quick and accurate results,without restricting fuel flow rate <br /> • Not impacted by thermal contraction of fuel in the line due to changes in temperature <br /> System Functionality <br /> • Monitors line pressure during dispensing activity to ensure a catastrophic leak is not <br /> occurring during a dispense <br /> • If a leak is detected at a pre-set pressure threshold,the system will shutoff power to the <br /> Submersible Turbine Pump (STP)to minimize environmental damage and help prevent a <br /> public safety issue <br /> • Conducts test once all dispensing is completed to ensure the integrity of the line <br />
The URL can be used to link to this page
Your browser does not support the video tag.