My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1176
>
2800 - Aboveground Petroleum Storage Program
>
PR0528253
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 9:20:21 AM
Creation date
11/4/2024 1:42:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0528253
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0003822
FACILITY_NAME
ESCALON UNIFIED SCHOOL DIST
STREET_NUMBER
1176
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22705007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1176 STANISLAUS ST ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />CP22 - AST Non-Qualified Inspection Report <br />Date: <br />October 30, 2024 <br /> Facility Address: <br /> 1176 STANISLAUS ST, ESCALON <br /> Facility Name: <br /> ESCALON UNIFIED SCHOOL DIST <br /> □ OUT □ R □ COS4045 - Release/Leaks/Spills - General Local Ordinance 86 <br /> □ OUT □ R □ COS4050 - Abandonment/Illegal Disposal/Unauthorized Treatment - General See below 87 <br /> □ OUT □ R □ COS4055 - Abandonment/Illegal Disposal/Unauthorized Treatment - General Local Ordinance 88 <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br />Code of Fed Regulations 112.5(b) 4010009 - 5 year review performed on SPCC and documented. <br />OBSERVATION: The facility failed to perform the 5-year review of the SPCC plan. The Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan was last reviewed on 4/9/2011 <br />REGULATION GUIDANCE: (b) Notwithstanding compliance with paragraph [112.5] (a) of this section, complete a <br />review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to <br />this part; or, if your facility was in operation on or before August 16, 2002, five years from the date your last review was <br />required under this part. As a result of this review and evaluation, you must amend your SPCC Plan within six months <br />of the review to include more effective prevention and control technology if the technology has been field -proven at the <br />time of the review and will significantly reduce the likelihood of a discharge as described in § 112.1(b) from the facility. <br />You must implement any amendment as soon as possible , but not later than six months following preparation of any <br />amendment. You must document your completion of the review and evaluation , and must sign a statement as to <br />whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. The <br />following words will suffice, “I have completed review and evaluation of the SPCC Plan for (name of facility) on (date), <br />and will (will not) amend the Plan as a result.” <br />CORRECTIVE ACTION: Immediately complete and document the 5-year review of the SPCC Plan and make any <br />necessary amendments (a Professional Engineer must certify any technical amendments). Submit verification of <br />adequate SPCC plan review completion to the EHD. <br />This is a repeat violation (Class 2) Violation. <br /> 10 <br />Code of Fed Regulations 112.7(a)(3) 4010016 - Physical layout of the facility is adequately and accurately described <br />in SPCC. <br />OBSERVATION: The Spill Prevention, Control, and Countermeasure (SPCC) Plan failed to include an adequate facility <br />diagram. The facility diagram is outdated and is missing location of the: <br />- 240-gallon used oil tank <br />- 80-gallon motor oil tank <br />- 115-gallon transmission/motor oil tank <br />The following were listed on the diagram but was not observed during the inspection: <br />- 500-gallon waste oil oil <br />- 55-gallon mixed oil <br />- 30-gallon waste oil <br />- three 55-gallon waste oil <br />REGULATION GUIDANCE: (3) Describe in your Plan the physical layout of the facility and include a facility diagram, <br />which must mark the location and contents of each fixed oil storage container and the storage area where mobile or <br />portable containers are located. The facility diagram must identify the location of and mark as “exempt” underground <br />tanks that are otherwise exempted from the requirements of this part under § 112.1(d)(4). The facility diagram must <br />also include all transfer stations and connecting pipes, including intra-facility gathering lines that are otherwise <br /> 14 <br />FA0003822 PR0528253 SC001 10/30/2024 <br />EHD Rev. 12/06/2021 CP22 - AST Non-Qualified OIRPage 5 of 11 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD
The URL can be used to link to this page
Your browser does not support the video tag.