Laserfiche WebLink
1534 Willow Pass Road,Pittsburg,CA 94565-1701 <br /> M C C a m p b e l l Analytical, Inc. Toll Free Telephone:(877)252-9262/Fax:(925)252-9269 <br /> "When Quality Counts" http://www.mccampbell.com/E-mail:main@mccampbell.com <br /> WORK ORDER SUMMARY <br /> Client Name: ICES Project: ICES 9315;Kautz Property Work Order: 241OL96 <br /> Client Contact: Peng Leong QC Level: LEVEL 2 <br /> Contact's Email: alphaenv222@gmaiI.com Comments Date Logged: 10/29/2024 <br /> 1:1WaterTrax CLIP [41 EDF Excel EQuIS DEmail F-]HardCopy E]ThirdParty [:]J-flag <br /> Lab1D ClientSampID Matrix Test Name Cont./ Bottle& U** Head Dry- Collection Date TAT Test Due Date Sediment Hold Sub <br /> Comp. Preservative Space Weight &Time Content Out <br /> 001A KI Soil SW6020(Metals)<Arsenic,Lead, 1 40Z GJ,Unpres 10/28/2024 5 days 11/5/2024 <br /> Mercury> <br /> SW8081B(OC Pesticides) ❑ U 5 days 11/5/2024 <br /> 002A K2 Soil SW6020(Metals)<Arsenic,Lead, 1 40Z GJ,Unpres ❑ ❑ E] 10/28/2024 5 days 11/5/2024 <br /> Mercury> <br /> SW8081B(OC Pesticides) ❑ ❑ 7 5 days 11/5/2024 ❑ ❑ <br /> 003A K3 Soil SW6020(Metals)<Arsenic,Lead, 1 40Z GJ,Unpres ❑ 10/28/2024 5 days 11/5/2024 <br /> Mercury> <br /> SW8081B(OC Pesticides) ❑ ❑ 171 5 days 11/5/2024 ❑ ❑ <br /> 004A K4 Soil SW6020(Metals)<Arsenic,Lead, 1 40Z GJ,Unpres ❑ ❑ E] 10/28/2024 5 days 11/5/2024 <br /> Mercury> <br /> SW8081B(OC Pesticides) 5 days 11/5/2024 <br /> 005A K5 Soil SW6020(Metals)<Arsenic,Lead, 1 40Z GJ,Unpres ❑ 10/28/2024 5 days 11/5/2024 ❑ ❑ <br /> Mercury> <br /> SW8081B(OC Pesticides) ❑ ❑ El 5 days 11/5/2024 ❑ ❑ <br /> NOTES: *STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br /> in 3 days from sample submission). <br /> - ISM prep requires 5 to 10 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results in 6 to 11 <br /> days from sample submission). Due date listed on WO summary will not accurately reflect the time needed for sample preparation. <br /> -Organic extracts are held for 40 days before disposal; Inorganic extract are held for 30 days. <br /> - MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material <br /> from the sample prior to sample preparation unless requested in writing by the client. <br /> U**=An unpreserved container was received for a method that suggests a preservation in order to extend hold time for analysis. <br /> Cont./Comp.=Containers/Composites Page 1 of 1 <br /> Page 15 of 17 <br />