My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2800 - Aboveground Petroleum Storage Program
>
PR0515728
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:49:08 PM
Creation date
12/30/2024 11:23:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0515728
PE
2831 - AST FAC >/= 1,320 - <10 K GAL CUMULATIVE
FACILITY_ID
FA0000187
FACILITY_NAME
JR SIMPLOT CO
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
16777 HOWLAND RD LATHROP 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br /> Facility Name: JR Sim-plot CO <br /> Facility Address: 16777 Howland Road, Lathrop, CA 95330 Program Record:PR0515728 <br /> Date: 12/12/2024 <br />Aboveground Petroleum Storage Act Inspection Report <br /> Facility Phone:209) 972-1896 <br /> Inspection Type: Genric Program: AST-2831 <br /> Inspection Contact: Cesar Title: Environmental Manager Phone:209) 972-1896 <br />Overall Inspection Comments <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Inspector: Date: <br />Printed Name and Title: <br />EHD 28-01 Rev. 01/20/22 Page 1 of 1 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD <br />Facility has approximately 1,519 gallons of petroleum product on site. Facility has decommissioned the <br />manufacture operation. <br />The facility has has a full SPCC plan that was last certified on June 12,20203. Facility has updated the SPCC plan to <br />remove tanks that have been decommissioned and in the process. to be certified by the engineer. There are no <br />individual aboveground oil storage containers greater than 5,000 gallons. Facility is Tier I qualified facility.
The URL can be used to link to this page
Your browser does not support the video tag.