Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T-1 87 T-2 91 T-3 DIESEL <br /> Are both vent and tank riser piping ® Yes ® Yes ® Yes ® Yes <br /> secondarily contained? ® No ® No ® No El No <br /> OPE Model 71SO 71SO 71SO <br /> What is the OPE response when ® Shut off ® Shut off ® Shut off L7 Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ® Restricts ®Restricts ® Restricts ® Restricts <br /> Flow Flow Flow Flow <br /> ® Audible ® Audible ® Audible ® Audible <br /> Alarm Alarm Alarm Alarm <br /> © Visual © Visual ® Visual ® Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* ® Yes* ® Yes* ® Yes* <br /> that may interfere with the OPE operation? ® No ® No ® No ® No <br /> At what level in the tank is the OPE set to 106.750 107.25 106.750 <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 9398% 94.31% 93.98% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ® Yes ® Yes* ® Yes* ® Yes* <br /> respond when the stored substance © No ® No ® No ® No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results © Pass 0 Pass © Pass ® Pass <br /> ® Fail ® Fail Fail ® Fail <br /> S. COMMENTS <br /> Describe all answers marked "No"or"Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />