Laserfiche WebLink
Underground Storage Tank <br /> JST Operator Visual Inspection Report m <br /> -+ v <br /> z � <br /> � n <br /> -i <br /> m <br /> G <br /> MANCE Yes No NA Date last <br /> tification been completed within the past © Performed $ <br /> 3-12-2024 <br /> been completed within the past <br /> 3-12-2024 <br /> equipment inspection been completed within ® © E <br /> 5-20-2021 m <br /> T <br /> .iinment testing been completed within the past rn r rl <br /> testing been completed within required > <br /> rj ri ® <br /> a <br /> 3s testing been completed within the required ® T7 T <br /> y <br /> laintenance: ® r 44-2023 `.. <br /> Maintenance: Tj <br /> / Maintenance: ® r 1 <br /> tLITY'EMPLOYEE TRAINING _ Yes No <br /> individuals performing facility employee duties received the required facility <br /> ee training within the past 12 months? <br /> ,� 'TS <br /> section may be used to record comments or observations that are not current compliance <br /> ciencies. oW I V" c + 1 c o <br /> I Z-- <br /> answers marked "No"must be described by the designated UST operator in Section I <br /> Page 4of4 <br />