Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> sup secondary line failed at bravo nut in udc 1/2,5/6,9/10. udc 5/6 and 9/10 failed hydrostatic testing.(site of failure unknown)a <br /> others completed with passing results. <br /> All tests marked `'Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />