My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2026 11:14:51 AM
Creation date
1/2/2025 4:52:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231072
PE
2361 - UST FACILITY
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2705 COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nork Performed: <br /> Safety Analysis and uploaded JSA form to Walton Work Orders <br />�/11/25 Performed Job <br /> valve not functioning properly. e want it replaced and then the filter installed that they <br />,/11/25 #3/4 Diesel shearvalve <br /> shear valve did not shut off and they <br /> Per calibration company dispenser. Took picture of shear valve. art and return to install. Filled out maintenance and vendor <br /> left �n the p roducts dispensed. Will order p <br /> All is in service with no p <br /> logs. <br />,/11/25 Work order updated in IDS. half of she; <br /> 1/14/25 On site for 3-4 DSL shear valve not working. sure on DSL line. <br /> Blocked off pump <br /> 3-4 diesel, pump test an <br /> d found no pressure on line. LOTO diesel STP, removed op <br /> er working condition. Shear valve would not lock closed i in e to no al has power and amps are at <br /> valve, valve is in prop reads 0 . Checked al 9 <br /> Hooked up PSI gauge to line and set prepay gauge laced MLLD LD200 pump <br /> 5.8. further troublesh <br /> oot and found that the Leak Detector was bad stuck clo dRm and shut off flow when <br /> test and <br /> PSI shot up to 40 and is pumping full flow. Checked Shear valve multiple <br /> tripped. hecked calibration on 3-4 diesel all within tolerance. 3-4 back in <br /> Replaced provided filter from calibration co. C <br /> service. <br />/14/25 Performed Job <br /> SafetyAnalysis and uploaded JSA form to the Walton Wo oOrder. <br /> ft a er work order on site in compliance box and filled out maintenance9 <br /> Le p p <br /> pen Problems: <br /> 11/25 poss <br /> ible construction needed due to Bravo plastic nut. See attached picture <br /> OPW P1 <br /> 1 EA 302-91010 OPW 1 OBHMP-5830 Shear Valve 1 .5 M Double Poppet <br /> F <br /> irts Used: Desc <br /> tY Part # Mfg Mfg Part # New Serial # <br /> Arrival D <br />)a Technician Arrival D parture e Date echnician <br />)ate —Technician 10:00 <br /> Bush; Robert E. 4/25 Davis; Jon P <br /> 11/25 B 12:54 13:55 2/1 <br /> 14/25 Sanchez; Elodio Q. 10:20 15:00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.