My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2026 7:45:36 PM
Creation date
1/6/2025 3:03:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231706
PE
2361 - UST FACILITY
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
6421 CAPITOL AVE LODI 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID UDC 9&10 UDC 11&12 Vent Sump <br /> Sump Manufacturer Environ Environ Bravo <br /> Sump Depth (inches) 30" 29" 27" <br /> Sump Bottom to Top of 9" 9" 10" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 1:27 1:32 1:37 <br /> Initial Reading .001 .001 .001 <br /> Test End Time 1:57 2:02 2:07 <br /> Final Reading .001 .001 .001 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 <br /> Tightness Test Results M Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID 1-91-FS 2-87-M-FS 3-87-S-FS 4-Diesel-FS <br /> Sump Manufacturer CSI CSI CSI CSI <br /> Sump Depth (inches) 52" 50" 49" 42" <br /> Sump Bottom to Top of 10" 10" 10" 10" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:37 11:42 11:47 11:52 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 12:07 12:12 12:17 12:22 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.