My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2026 7:45:36 PM
Creation date
1/6/2025 3:03:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231706
PE
2361 - UST FACILITY
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
6421 CAPITOL AVE LODI 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br /> Tank ID 1-91 2-87-Master 3-87-Siphon 4-Diesel <br /> Tank Manufacturer CSI CSI CSI CSI <br /> Tank Capacity 12K 10K 10K 10K <br /> Test Start Time 10:50 11:00 11:10 11:20 <br /> Initial Reading -10" Hg. -10" Hg. -10" Hg. -10" Hg. <br /> Test End Time 11:50 12:00 12:10 12:20 <br /> Final Reading -10" Hg. -10" Hg. -10" Hg. -10" Hg. <br /> Change in Reading 0" Hg. 0" Hg. 0" Hg. 0" Hg. <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ® Pass ❑ Fail I ® Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-91-Product 2-91-Vent 3-87-M-Pro 4-87-Siphon <br /> Pipe Manufacturer Smith Smith APT Smith <br /> Test Start Time 10:45 10:48 10:52 10:55 <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 11:45 11:48 11:52 11:55 <br /> Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID 5-87M/S-Vent 6-Dsl Pro 7-Dsl Vent 8-Gas Vapor <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 10:58 11:03 11:05 10:56 <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 11:58 12:03 12:05 11:56 <br /> Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.