My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 10:13:01 PM
Creation date
1/6/2025 4:11:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0505264
PE
2361 - UST FACILITY
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1501 N JACK TONE RD RIPON 95366
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and ❑ ❑ 12 <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup ❑ ❑ 12 <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ 52 <br /> Was accuracy of system's water level readings tested? ❑ ❑ 12 <br /> Were all probes reinstalled properly? ❑ ❑ 12 <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ I ❑ Kj <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ I ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No"or "Fail'and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> THIS MONITORING SYSTEM CERTIFICATION IS FOR THE L8, DIESEL TANK ANNULAR, <br /> WHICH WAS REPLACED DUE TO WIRE TO WAS BROKEN AND CAUSING AN L8 SENSOR OUT <br /> ALARM AND NEW SENSOR TESTED GOOD. ONLY ITEMS RELATED TO REPLACEMENT AND <br /> TESTING OF THE L8 ANNULAR SENSOR ARE NOTED ON THIS CERTIFICATION FORM. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.