Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE Yes No NA Date last <br /> performed <br /> Has monitoring system certification been completed within the past 0 © 1/9/2024 <br /> 12 months? <br /> Has spill container testing been completed within the past C 0 1/9/2024 <br /> 12 months? <br /> Has overfill prevention equipment inspection been completed within 0 ❑ ❑ 1/27/2022 <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past X❑ 1/10/2024 <br /> 36 months? <br /> Has tank tightness testing been completed within required 0 <br /> timeframes? <br /> Has line tightness testing been completed within the required ❑ ❑ ®✓ <br /> timeframes? <br /> Other Test / Maintenance: C 97 97 <br /> Other Test / Maintenance: 0 r <br /> Other Test / Maintenance: ANNUAL TRAINING 0 ® 1/11/2024 <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility ❑x ❑ <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> ANNUAL TRAING IS DUE IN JAN... <br /> All answers marked "No"must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br />