Laserfiche WebLink
SCOPE OF WORK <br /> Install Overfill Prevention Equipment for Waste Oil Tank <br /> • Remove existing drop tubes, if any. <br /> • Measure and Assemble Overfill Valve to restrict flow at 95% or less per local <br /> regulatory requirements <br /> • Install the new Universal 47-20 Overfill Valve <br /> • Perform Universal Overfill Valve Inspection and submit a report. <br /> Demonstrate passing Overfill Valve test for the Inspector to confirm regulatory <br /> compliance. <br /> 1 <br />